SCH Number 2005072046
Project Info
- Title
- American River Common Features, 2016 Flood Risk Management Project, Sacramento, California
- Description
- The U.S. Army Corps of Engineers (USACE), the Central Valley Flood Protection Board (Board), and the Sacramento Area Flood Control Agency (SAFCA) propose design refinements to the 2016 American River Watershed Common Features General Reevaluation Report, Final EIS/EIR (2016 ARCF GRR EIS/EIR), involving Magpie Creek Project (MCP); American River Erosion Contracts 3B, 4A and 4B; Sacramento River Erosion Contract 3; American River Mitigation Site (ARMS); Sacramento River Mitigation Site (SRMS); and installation of a Piezometer Network. This Draft SEIS/SEIR supplements the 2016 ARCF GRR EIS/EIR, which authorized the overall ARCF Project, to address seepage, slope stability, erosion, and height concerns on the levees along the Sacramento and American Rivers for the purposes of flood risk management for the Sacramento Metropolitan area. Portions of the project site are included on the Cortese List (Government Code Section 65962.5).
55 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
JD | Central Valley Flood Protection Board | American River Common Features, 2016 Flood Risk Management Project, Sacramento, California | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River Erosion Contract 4 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River Erosion Contract 4 | |
FIN | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River Erosion Contract 4 | |
NOD | Central Valley Flood Protection Board | ARCF 2016 Project, Sacramento River Erosion Contract 4 Project | |
NOE | Central Valley Flood Protection Board | ARCF 2016, American River Contract 2 Project (ARC2 Project): Geotechnical Investigations | |
NOE | Central Valley Flood Protection Board | ARCF 2016, American River Contract 4A: Archeological, Geotechnical, Environmental, Topographic and Utility Surveys | |
SEA | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River Erosion Contract 4 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 4 | |
NOD | Central Valley Flood Protection Board | ARCF 2016 Project, Sacramento River Erosion Contract 2 Project | |
NOD | Central Valley Flood Protection Board | ARCF 2016 Project, Sacramento River East Levee Contract 4 Project | |
NOD | Central Valley Flood Protection Board | ARCF 2016 Project, Lower American River Erosion Contract 3A, Site 1-1 Project | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4 | |
NOD | Central Valley Flood Protection Board | ARCF 2016 Project, American River Contract 3A | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), American River Contract 3A | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4 (SREL C4 Project) | |
FIN | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 3A | |
FIN | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 1 | |
SEA | Central Valley Flood Protection Board | American River Watershed Common Features Water Resources Development Act of 2016 California Sacramento River East Levee Contract 4 | |
SEA | Central Valley Flood Protection Board | American River Watershed Common Features Project, American River Contract 3A | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento Weir Widening Project | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features 2016 Project, Sacramento River East Levee Contract 3 | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features, American River Contracts 3b & 4a: Geotechnical and Environmental Surveys | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 3 | |
NOD | Central Valley Flood Protection Board | America River Watershed Common Features 2016 Project, American River Contract 2 | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features, American River Contract 4a and American River Contract 4b: Topographic and Utility Surveys | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2 | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features, Water Development Act of 2016 Project – Sacramento River East Levee Contract 4 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features Project | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features 2016 Project, American River Contract 1 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 1 | |
SIR | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 3 | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features – Sacramento River East Levee Contract 3 and Contract 4: Geotechnical Soil Sampling | |
SIR | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), American River Contract 1 | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 – Sacramento River East Levee Contract 4 (SREL C4 Project) Topography and Util | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features (ARCF) 2016 American River North Reach I, Magpie Creek Exploratory Surveys | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features (ARCF) 2016 Project - Sacramento River East Levee (SREL) Contract 3 and SREL Contract 4 Projects | |
NOE | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Geotechnical Investigations | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features 2016 Project, Sacramento River East Levee Contract 2 | |
SIR | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 2 | |
EIR | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016, American River Contract 1. | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 1 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features 2016 Project, Sacramento River East Levee Contract 1 | |
SIR | Central Valley Flood Protection Board | American River Watershed Common Features, WRDA 2016 Project, Sacramento River East Levee Contract 1 | |
NOD | Central Valley Flood Protection Board | American River Watershed Common Features, Beach-Stone Lakes Mitigation Site Project | |
MND | Central Valley Flood Protection Board | American River Watershed Common Features 2016 Project, Beach-Stone Lakes Mitigation Site | |
NOD | Central Valley Flood Protection Board | ARCF 2016, Sacramento River, Reach D, Contract 1, Front Street Stability Berm. | |
MND | Central Valley Flood Protection Board | Sacramento River, Reach D, Contract 1 (RDC1) Front Street Stability Berm Project | |
NOD | Central Valley Flood Protection Board | American River Common Features General Reevaluation Report | |
FIN | Central Valley Flood Protection Board | American River Common Features General Re-evaluation Report | |
EIR | Central Valley Flood Protection Board | American River Common Features General Re-evaluation Report | |
NOP | Central Valley Flood Protection Board | American River Common Features General Re-evaluation Report | |
NOP | Central Valley Flood Protection Board | American River Watershed-Common Features, Sacramento River East Levee & Natomas Cross Canal Levee Modification |