SCH Number 2005072046


Project Info

Title
American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 3A
Description
The ARC3A Project includes the installation of approximately 3,000 linear feet of levee erosion protection to reduce the risk of levee erosion during high flow events on the Lower American River. The ARC3A Project also includes the installation of on-site riparian habitat features and instream woody material to provide on-site habitat for fish and wildlife species. The purpose of the ARC3A Project is to reduce the risk of levee failure caused by erosion during high-flow events on the Lower American River. The ARC3A Project would strengthen the Lower American River levee system and reduce the risk of a catastrophic flood event within the Sacramento metropolitan area.
Download CSV New Search

 

46 documents in project

Type Lead/Public Agency Received Title
Central Valley Flood Protection Board ARCF 2016 Project, Sacramento River Erosion Contract 2 Project
Central Valley Flood Protection Board ARCF 2016 Project, Sacramento River East Levee Contract 4 Project
Central Valley Flood Protection Board ARCF 2016 Project, Lower American River Erosion Contract 3A, Site 1-1 Project
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4
Central Valley Flood Protection Board ARCF 2016 Project, American River Contract 3A
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), American River Contract 3A
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4 (SREL C4 Project)
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 3A
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 1
Central Valley Flood Protection Board American River Watershed Common Features Water Resources Development Act of 2016 California Sacramento River East Levee Contract 4
Central Valley Flood Protection Board American River Watershed Common Features Project, American River Contract 3A
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento Weir Widening Project
Central Valley Flood Protection Board American River Watershed Common Features 2016 Project, Sacramento River East Levee Contract 3
Central Valley Flood Protection Board American River Watershed Common Features, American River Contracts 3b & 4a: Geotechnical and Environmental Surveys
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 3
Central Valley Flood Protection Board America River Watershed Common Features 2016 Project, American River Contract 2
Central Valley Flood Protection Board American River Watershed Common Features, American River Contract 4a and American River Contract 4b: Topographic and Utility Surveys
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2
Central Valley Flood Protection Board American River Watershed Common Features, Water Development Act of 2016 Project – Sacramento River East Levee Contract 4
Central Valley Flood Protection Board American River Watershed Common Features Project
Central Valley Flood Protection Board American River Watershed Common Features 2016 Project, American River Contract 1
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 1
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 3
Central Valley Flood Protection Board American River Watershed Common Features – Sacramento River East Levee Contract 3 and Contract 4: Geotechnical Soil Sampling
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), American River Contract 1
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 – Sacramento River East Levee Contract 4 (SREL C4 Project) Topography and Util
Central Valley Flood Protection Board American River Watershed Common Features (ARCF) 2016 American River North Reach I, Magpie Creek Exploratory Surveys
Central Valley Flood Protection Board American River Watershed Common Features (ARCF) 2016 Project - Sacramento River East Levee (SREL) Contract 3 and SREL Contract 4 Projects
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, Geotechnical Investigations
Central Valley Flood Protection Board American River Watershed Common Features 2016 Project, Sacramento River East Levee Contract 2
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 2
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016, American River Contract 1.
Central Valley Flood Protection Board American River Watershed Common Features, Water Resources Development Act of 2016 Project, Sacramento River East Levee Contract 1
Central Valley Flood Protection Board American River Watershed Common Features 2016 Project, Sacramento River East Levee Contract 1
Central Valley Flood Protection Board American River Watershed Common Features, WRDA 2016 Project, Sacramento River East Levee Contract 1
Central Valley Flood Protection Board American River Watershed Common Features, Beach-Stone Lakes Mitigation Site Project
Central Valley Flood Protection Board American River Watershed Common Features 2016 Project, Beach-Stone Lakes Mitigation Site
Central Valley Flood Protection Board ARCF 2016, Sacramento River, Reach D, Contract 1, Front Street Stability Berm.
Central Valley Flood Protection Board Sacramento River, Reach D, Contract 1 (RDC1) Front Street Stability Berm Project
Central Valley Flood Protection Board American River Common Features General Reevaluation Report
Central Valley Flood Protection Board American River Common Features General Re-evaluation Report
Central Valley Flood Protection Board American River Common Features General Re-evaluation Report
Central Valley Flood Protection Board American River Common Features General Re-evaluation Report
Central Valley Flood Protection Board American River Watershed-Common Features, Sacramento River East Levee & Natomas Cross Canal Levee Modification