American River Watershed Common Features Project

55 Documents in Project

Summary

SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
American River Watershed Common Features Project
Document Type
NOD - Notice of Determination
Received
Posted
8/26/2021
Document Description
he Project consists of protecting and strengthening levees in the Project Area at specific Project Sites, including installing erosion protection and stability and seepage measures for the Sacramento River, American River, Magpie Creek and widening the Sacramento Weir and Bypass to provide capacity to divert a greater volume of floodwater into the Yolo Bypass when necessary to protect metropolitan Sacramento. Individual projects authorized by the Central Valley Water Board under this Order will include levee maintenance, repair and erosion control activities along the American River, Sacramento River, Magpie Creek, and Robla Creek. Project activities include seepage and slope protection, overtopping protection, erosion protection, and widening the Sacramento Weir and Bypass.

Contact Information

Name
Angela Nguyen-Tan
Agency Name
Central Valley Regional Water Quality Control Board
Contact Types
Responsible Agency

Location

Cities
Sacramento
Counties
Sacramento
Waterways
American River, Sacramento River, Sacramento Weir and Bypass, Natomas East Main Drainage Canal,

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
Central Valley Flood Protection Board, 3310 El Camino Ave, Room 151, Sacramento, CA 95821.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print