ARCF 2016, Sacramento River, Reach D, Contract 1, Front Street Stability Berm.
56 Documents in Project
Summary
SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
ARCF 2016, Sacramento River, Reach D, Contract 1, Front Street Stability Berm.
Document Type
NOD - Notice of Determination
Received
Posted
2/28/2019
Document Description
The Sacramento River, Reach D, Contract 1, Front Street Stability Berm, is a component of the American River Common Feature 2016 project. The project will construct a levee improvement consisting of a an approx. 400 foot long stability berm against the land side slope of the Sac River east levee. Through seepage conditions in the Project area make this section of the levee susceptible to failure during high water events. The purpose of the project is to reinforced and reduce seepage through this section of the levee system via the construction of a landside stability berm.
Contact Information
Name
Miles Claret
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Cross Streets
Front Street, U St
Zip
95811
Parcel #
mult
State Highways
50, I-5
Railways
SPRR
Waterways
Sacramento River
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.