ARCF 2016 Project, Sacramento River Erosion Contract 2 Project

56 Documents in Project

Summary

SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
ARCF 2016 Project, Sacramento River Erosion Contract 2 Project
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2022
Document Description
The purpose of the Project is to improve Sacramento River’s east levee through installation of approximately 2.8 miles of bank protection to stop erosion and scour damage and provide riverbank resistance to wave wash. The project footprint includes the water side levee slope, below the ordinary high-water mark (OHWM), the river for barge access, two land side access points, and staging areas. The Project will replace four pipes on the water side of the levee, replace the headwall, and utilize a cofferdam to dewater if the area is not naturally dewatered. A launchable Grade C quarry stone will be placed above and below the water surface to protect the bank from scour, erosion, wave wash generated by boat wakes and wind waves.

Contact Information

Name
Jenna Yang
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Water Resource Control Engineer
Contact Types
Responsible Agency

Location

Counties
Sacramento
Regions
Northern California
Other Location Info
Sacramento River's east levee

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
3310 El Camino Avenue, Suite 170, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print