American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4 (SREL C4 Project)

55 Documents in Project

Summary

SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River East Levee Contract 4 (SREL C4 Project)
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2022
Document Description
The proposed project consists of approximately 12,880 feet of levee raises, cut off walls, seepage berm, and other levee improvements along the Sacramento River’s east levee in Sacramento, California. The SREL C4 is the fourth contract on the Sacramento River to address seepage and stability concerns along the Sacramento River east levee. The work encompassed by the SREL C4 Project would reduce risks of levee failure, especially related to seepage and underseepage, overtopping, and levee stability.

Contact Information

Name
Kalia Schuster
Agency Name
Central Valley Flood Protection Board
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Regions
Northern California
Other Location Info
The SREL C4 Project is located in Sacramento County in California, along the east levee of the Sacramento River, from approximately I Street Bridge in downtown Sacramento to the town of Freeport.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print