American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2

55 Documents in Project

Summary

SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2021
Document Description
The American River Contract 2 Project includes the installation of approximately 8,148-feet of levee erosion protection along the American River to reduce the risk of levee failure due to erosion. The American River Contract 2 Project includes the installation of a riparian planting bench and in-stream woody material to provide on-site habitat to fish and wildlife species. The American River Contract 2 Project also includes reconstruction of the Campus Commons Golf Course and construction of three off-site habitat restoration sites for mitigation (Arden Pond near the existing William B. Pond Recreation Area and two areas at Rossmoor Bar) within the American River Parkway.

Contact Information

Name
Miles Claret of the Department of Water Resources
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Regions
Northern California
Other Location Info
The American River Contract 2 Project is located in the City of Sacramento, California along the Lower American River right bank and levee (when looking downstream) from just upstream of the Howe Avenue Bridge to the downstream end of the Campus Commons Golf Course.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print