America River Watershed Common Features 2016 Project, American River Contract 2
55 Documents in Project
Summary
SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
America River Watershed Common Features 2016 Project, American River Contract 2
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2021
Document Description
The ARC2 Project includes the installation of approximately 8,148-feet of levee erosion protection along the American River to reduce the risk of levee failure due to erosion. The ARC2 Project includes the installation of a riparian planting bench and in-stream woody material to provide on-site habitat to fish and wildlife species. The ARC2 Project also includes reconstruction of the Campus Commons Golf Course and construction of three off-site habitat restoration sites for mitigation (Arden Pond near the existing William B. Pond Recreation Area and two areas at Rossmoor Bar) within the American River Parkway.
Contact Information
Name
Doreen kiruja
Agency Name
DWR
Contact Types
Responsible Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
Howe Avenue Bridge and American River Parkway
Total Acres
Appr 8,148 miles
Waterways
American River
Other Location Info
Along the right descending bank of the American River at Howe Bridge to Campus Common Golf Course
Notice of Determination
Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
3310 El Camino Avenue, Suite 170 Sacramento, CA 95821
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.