American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2 Project
56 Documents in Project
Summary
SCH Number
2005072046
Lead Agency
Central Valley Flood Protection Board
Document Title
American River Watershed Common Features, Water Resources Development Act of 2016 Project, American River Contract 2 Project
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2024
Document Description
The Project includes the construction and use of erosion protection including launchable rock toe protection, rock tiebacks, planting benches, and soil-filled rock slope protection along the American River at Site 2-2. The State Lands Commission action is an approval of a 20-year General Lease – Public Agency Use through December 16, 2044.
Contact Information
Name
Afifa Awan
Agency Name
State Lands Commission
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Email
Location
Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Cross Streets
Adjacent to the right bank of the American River from River Mile (RM) 7.45 to 7.65 at the Howe A
Waterways
American River
Other Location Info
Sovereign land in the American River, adjacent to the right bank of the American River from River Mile (RM) 7.45 to 7.65 at the Howe Avenue Bridge, near Sacramento, Sacramento County
Notice of Determination
Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
100 Howe Avenue, Suite 100 South, Sacramento, CA 95825-8202
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.