SCH Number 2010121069


Project Info

Title
Metro Gold Line Foothill Extension Phase 2B - Azusa to Montclair
Description
The Project Modifications include relocation of the proposed parking facility at the San Dimas Station from the previously approved location to a new location south of the project right-of-way between Monte Vista Avenue and San Dimas Avenue. The Project Modifications are proposed as a result of coordination conducted between the City of San Dimas and the Construction Authority. Approximately 289 parking spaces would be provided which is consistent with the number of parking spaces with the approved location in SEIR 2. No modifications are proposed for the parking facilities at the Glendora, La Verne, Pomona, Claremont, or Montclair Stations. Relocation of the San Dimas parking facility would result in associated vehicle and pedestrian access changes in the vicinity of the San Dimas Station. All parking modifications would be designed and constructed in accordance with the Metro Rail Design Criteria. Pursuant to Public Resources Code Section 21092.6(a), the relocated parking area is not located on a hazardous waste site per Section 65962.5 of the California Government Code (Cortese List). The proposed changes do not alter the scope of the Project as approved by the Construction Authority. The Project elements, including alignment, stations, and grade crossings, would be the same as presented in the 2013 FEIR (with addenda, SEIR 1 and SEIR 2), with the exception of the relocated parking location in San Dimas and associated changes to vehicle and pedestrian access discussed in the Draft SEIR. All other features of the Project would remain the same as described in the 2013 FEIR (with its addenda, SEIR 1 and SEIR 2).
Download CSV New Search

 

22 documents in project

Type Lead/Public Agency Received Title
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B (San Dimas Parking Facility Relocation) Final SEIR 3
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B - Azusa to Montclair
Metro Gold Line Foothill Extension Construction Authority Proceeding A1908004 Metro Gold Line Foothill Extension Construction Authority to Construct the La Verne Station East Pedestrian At-Grade Light Rail Crossing in
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B - Supplemental EIR - San Dimas Parking Lot Relocation
Metro Gold Line Foothill Extension Construction Authority Proceeding A1806008 for Metro Gold Line Foothill Extension Construction Authority for an order authorizing construction of two light rail tracks, and
Metro Gold Line Foothill Extension Construction Authority Variance TWW-2021-LG-00658 to Allow the Generation, Accumulation, and Transport of Treated Wood Waste under Alternate Procedures by Metro Goldline Foothill Ext
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Project Phase 2B (Azusa to Montclair)
Metro Gold Line Foothill Extension Construction Authority Draft Supplemental Environmental Impact Report for Metro Gold Line Foothill Extension Azusa to Montclair
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B
Metro Gold Line Foothill Extension Construction Authority MetroGold Line Foothill Ext.Const. of tracks-Bonita Ave/Cataract Ave & Monte Vista
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothil Extension
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Project Phase 2B (Azusa to Montclair)
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B - Supplemental EIR
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Azusa to Montclair (Phase 2B)
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Azusa to Montclair (Phase 2B)
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Project
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Project Phase 2B (Streambed Alteration Agreement No. 1600-2018-0001-R6)
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Project Phase 2B (Lake or Streambed Alteration Agreement No. 1600-2017-0287-R5)
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B - Supplemental EIR
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension - Azusa to Montclair
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B - Supplemental EIR
Metro Gold Line Foothill Extension Construction Authority Metro Gold Line Foothill Extension Phase 2B - Supplemental EIR