Metro Gold Line Foothill Extension - Azusa to Montclair
16 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2010121069
- Lead Agency
- Metro Gold Line Foothill Extension Construction Authority
- Document Title
- Metro Gold Line Foothill Extension - Azusa to Montclair
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/29/2017
- Present Land Use
- Residential and Mixed Use
- Document Description
- Metro Gold Line Foothill Extension - Azusa to Montclair project (Project). Refinements to the Project consisting of shifts in the LRT track geometry, modifications to parking facilities, modifications to grade crossing, relocation of traction power supply substations and modifications to adjacent land-uses are described in Addendum No. 4 to the FEIR. The Final EIR was certified on March 6, 2013. Addendum No. 4 assesses changes to the project resulting from refinements to the project proposed after the Metro Gold Line Foothill Extension Construction Authority certified the Final EIR.
- Contact Information
-
Lisa Levy Buch
Metro Gold Line Foothill Extension Construction Authority
406 E. Huntington Drive, Suite 202
Monrovia, CA 91016-3633
Phone : (626) 305-7004
llevybuch@foothillextension.org
Location
- Cities
- Azusa Azusa, Glendora, San Dimas, La Verne, Pomona, Claremont, ... Claremont Glendora La Verne Montclair Pomona San Dimas
- Counties
- Los Angeles San Bernardino
- State Highways
- I-210, SR 57, US 66, I-10
- Railways
- Metrolink, BNSF
Notice of Determination
- Approving Agency
- Metro Gold Line Foothill Extension Construction Authority
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 406 Eas tHuntington Dr., Suite 202, Monrovia, CA 91016-3633
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.