Metro Gold Line Foothill Extension Phase 2B (San Dimas Parking Facility Relocation) Final SEIR 3

22 Documents in Project

Summary

SCH Number
2010121069
Lead Agency
Metro Gold Line Foothill Extension Construction Authority
Document Title
Metro Gold Line Foothill Extension Phase 2B (San Dimas Parking Facility Relocation) Final SEIR 3
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2022
Document Description
The Project Modifications include relocation of the proposed parking facility at the San Dimas Station from the previously approved location to a new location south of the project right-of-way between Monte Vista Avenue and San Dimas Avenue. The Project Modifications are proposed as a result of coordination conducted between the City of San Dimas and the Construction Authority. Approximately 289 parking spaces would be provided which is consistent with the number of parking spaces with the approved location in SEIR 2. No modifications are proposed for the parking facilities at the Glendora, La Verne, Pomona, Claremont, or Montclair Stations. Relocation of the San Dimas parking facility would result in associated vehicle and pedestrian access changes in the vicinity of the San Dimas Station. All parking modifications would be designed and constructed in accordance with the Metro Rail Design Criteria. Pursuant to Public Resources Code Section 21092.6(a), the relocated parking area is not located on a hazardous waste site per Section 65962.5 of the California Government Code (Cortese List). The proposed changes do not alter the scope of the Project as approved by the Construction Authority. The Project elements, including alignment, stations, and grade crossings, would be the same as presented in the 2013 FEIR (with addenda, SEIR 1 and SEIR 2), with the exception of the relocated parking location in San Dimas and associated changes to vehicle and pedestrian access discussed in the Draft SEIR. All other features of the Project would remain the same as described in the 2013 FEIR (with its addenda, SEIR 1 and SEIR 2).

Contact Information

Name
Lisa Levy Buch
Agency Name
Metro Gold Line Foothill Extension Construction Authority
Job Title
Chief Communications Officer
Contact Types
Lead/Public Agency

Location

Cities
Azusa, Claremont, Glendora, La Verne, Montclair, Pomona, San Dimas
Counties
Los Angeles, San Bernardino
Regions
Countywide
Cross Streets
various
State Highways
I-210, SR 57, US 66, I-10
Railways
Metrolink, BNSF
Airports
Brackett Field Airport
Schools
Glendora High, Fred Ekstrand Elementary

Notice of Determination

Approving Agency
Metro Gold Line Foothill Extension Construction Authority
Approving Agency Role
Lead Agency
Approved On
County Clerks
Los Angeles, San Bernardino
Final Environmental Document Available at
the offices of the Metro Gold Line Foothill Extension Construction Authority, 406 East Huntington Drive, Suite 202, Monrovia, CA 91016-3633 and on the agency website www.foothillgoldline.org

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print