Metro Gold Line Foothill Extension Phase 2B - Azusa to Montclair
22 Documents in Project
Summary
SCH Number
2010121069
Lead Agency
Metro Gold Line Foothill Extension Construction Authority
Document Title
Metro Gold Line Foothill Extension Phase 2B - Azusa to Montclair
Document Type
SIR - Supplemental EIR
Received
Present Land Use
various
Document Description
The Project Modifications include relocation of the proposed parking facility at the San Dimas Station from the previously approved location to a new location south of the project right-of-way between Monte Vista Avenue and San Dimas Avenue. The Project Modifications are proposed as a result of coordination conducted between the City of San Dimas and the Construction Authority. Approximately 289 parking spaces would be provided which is consistent with the number of parking spaces with the approved location in SEIR 2. No modifications are proposed for the parking facilities at the Glendora, La Verne, Pomona, Claremont, or Montclair Stations. Relocation of the San Dimas parking facility would result in associated vehicle and pedestrian access changes in the vicinity of the San Dimas Station. All parking modifications would be designed and constructed in accordance with the Metro Rail Design Criteria. Pursuant to Public Resources Code Section 21092.6(a), the relocated parking area is not located on a hazardous waste site per Section 65962.5 of the California Government Code (Cortese List). The proposed changes do not alter the scope of the Project as approved by the Construction Authority. The Project elements, including
alignment, stations, and grade crossings, would be the same as presented in the 2013 FEIR (with addenda, SEIR 1 and SEIR 2), with the exception of the relocated parking location in San Dimas and associated changes to vehicle and pedestrian access discussed in the Draft SEIR. All other features of the Project would remain the same as described in the 2013 FEIR (with its addenda, SEIR 1 and SEIR 2).
Contact Information
Name
Lisa Levy Buch
Agency Name
Metro Gold Line Foothill Extension Construction Authority
Job Title
Chief Communications Officer
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Cities
Azusa, Claremont, Glendora, La Verne, Montclair, Pomona, San Dimas
Counties
Los Angeles, San Bernardino
Regions
Countywide
Cross Streets
various
State Highways
I-210, SR 57, US 66, I-10
Railways
Metrolink, BNSF
Airports
Brackett Field Airport
Schools
Glendora High, Fred Ekstrand Elementary
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 8 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), California Transportation Commission (CATC), Office of Historic Preservation, San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy (RMC), State Water Resources Control Board, Division of Water Quality, California Department of Transportation, District 7 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 7 (DOT)
Development Types
Transportation:Other (light rail transit)
Local Actions
Modifications to LRT station parking
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.