Metro Gold Line Foothill Extension Phase 2B - Supplemental EIR - San Dimas Parking Lot Relocation

22 Documents in Project

Summary

SCH Number
2010121069
Lead Agency
Metro Gold Line Foothill Extension Construction Authority
Document Title
Metro Gold Line Foothill Extension Phase 2B - Supplemental EIR - San Dimas Parking Lot Relocation
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Parking lot
Document Description
Phase 2B of the Metro Gold Line Foothill Extension (Project) is a 12.3-mile extension of the existing Metro Gold Line Light Rail Transit line from its current terminus in the City of Azusa, located in Los Angeles County, to the Montclair Transcenter, located in San Bernardino County. See map of project location in Figure NOP-1. In 2013, the Metro Gold Line Foothill Extension Construction Authority (“Authority”) certified a Final Environmental Impact Report (“FEIR”) and approved the Project. A detailed description of the Project is included in the FEIR and four addenda there to adopted by the Authority (State Clearinghouse No. 2010121069). In 2019, the Authority certified a Supplemental Environmental Impact Report (SEIR) to the 2013 FEIR which addressed changes to the phasing of construction and operation of the Project and identified a new traffic/transportation mitigation measure. In 2021, the Authority also certified the 2021 SEIR to the 2013 FEIR and subsequent environmental actions, which addressed modifications to construct surface parking lots (instead of enclosed parking structures, as previously approved) at the Glendora, San Dimas, La Verne, and Pomona Stations. On June 17, 2021, the City of San Dimas in cooperation with the Construction Authority approved a binding letter of intent to relocate the San Dimas parking lot. Parking for the San Dimas Station would be relocated from the location approved in the 2021 SEIR to a new location south of the project right-of-way between Monte Vista Avenue and San Dimas Avenue (NOP-2). The proposed new location is currently used as an existing San Dimas Park & Ride lot for Foothill Transit. The proposed new location would be redeveloped to accommodate the same number of parking spaces as identified for the approved parking location in San Dimas. The Authority also proposes new roadway and pedestrian access to the San Dimas Station. The approved parking facility assessed in the 2021 SEIR was located two blocks east along Arrow Highway, south of the project right-of-way and west of Walnut Avenue (NOP-3). No modifications are proposed for the parking facilities at the Glendora, La Verne, Pomona, Claremont, and Montclair Stations. In response to these proposed changes, the Authority will be initiating the preparation of a SEIR to evaluate the potential for significant impacts that may result from the proposed changes at the San Dimas Station.

Contact Information

Name
Lisa Levy Buch
Agency Name
Metro Gold Line Foothill Extension Construction Authority
Contact Types
Lead/Public Agency

Location

Cities
San Dimas
Counties
Los Angeles
Cross Streets
Monte Vista Avenue and San Dimas Avenue

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Department of Transportation, District 8 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Highway Patrol (CHP), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)
Development Types
Transportation:Rail (Parking lot designated for San Dimas Station)
Local Actions
Redevelopment
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Utilities/Service Systems

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print