SCH Number 2002011094


Project Info

Title
Matilija Dam Ecosystem Restoration Project Subsequent Environmental Impact Report
Description
In October 2000, VCPWA – WP, then the Ventura County Flood Control District, initiated the Matilija Dam Ecosystem Restoration Study as a joint effort between Watershed Protection and U.S. Army Corps of Engineers to develop a project resulting in the removal of Matilija Dam. The primary Project objectives included: aquatic and terrestrial habitat improvement, facilitating the return of a viable and abundant run of steelhead trout; and restoration of natural sediment transport processes along Matilija Creek and the Ventura River. The secondary objective was enhancement of recreational opportunities along these two waterways. The joint Environmental Impact Statement/Environmental Impact Report (EIS/EIR) certified in 2004 evaluated alternatives combining dam removal, sediment relocation, flood protection (levees), two bridge replacements, new recreation features, giant reed removal, and water supply improvements. Technical studies to refine project features continued between 2008 and 2016, resulting in a new dam removal method and reevaluation of other project components. In June 2017, VCPWA – WP received funding to implement the Matilija Dam Removal 65% Design Planning Project, comprising additional technical studies, construction design, and CEQA analyses. The VCPWA – WP has determined that preparation of a Subsequent EIR is warranted to provide a complete and objective analysis of the revised Matilija Dam removal approach. Dam removal would be accomplished by creating two 12-foot diameter orifices drilled near the dam base which would be opened in advance of a large storm event. Storm flows would then be expected to transport primarily fine-grained reservoir deposits from behind the dam downstream to Matilija Creek, the Ventura River and Pacific Ocean. After an adequate amount of sediment is flushed from behind the dam, physical dam removal would be conducted. Habitat restoration would be accomplished by managed natural recruitment and non-native plant control. Adaptive management would monitor and correct post dam removal river flow obstructions to fish passage.
Download CSV New Search

 

16 documents in project

Type Lead/Public Agency Received Title
California State Coastal Conservancy (SCC) Matilija Dam Ecosystem Restoration Project: Robles Diversion Design
Ventura County Watershed Protection District Matilija Dam Ecosystem Restoration Project Subsequent Environmental Impact Report
California State Coastal Conservancy (SCC) MATILIJA DAM ECOSYSTEM RESTORATION PROJECT: PRE-CONSTRUCTION ACTIVITIES
Ventura County Watershed Protection District Ventura River Invasive Plant Removal and Ecosystem Restoration Project (Amendment to Lake and Streambed Alteration Agreement (LSA) No. 1600-2015-0112-R5)
Ventura County Matilija Dam Ecosystem Restoration Feasibility Study FEIS/EIR (Lake or Streambed Alteration Agreement No. 1600-2020-0019-R5)
Ventura County Watershed Protection District Notice of Preparation of a Subsequent Environmental Impact Report for the Matilija Dam Ecosystem Restoration Project
Ventura County Matilija Dam Ecosystem Restoration Feasibility Study FEIS/EIR (Lake or Streambed Alteration Agreement No. 1600-2020-0019-R5)
Ventura County Approval of Minor Changes to, and Design Details for, the Santa Ana Boulevard Bridge Replacement Component of the previously Matilija Dam Ecosystem Restoration
Ventura County Watershed Protection District Ventura River Watershed Giant Reed Removal (Streambed Alteration Agreement No. 1600-2017-0064-R5 (SAA))
Ventura County Watershed Protection District Ventura River Invasive Plant Removal and Ecosystem Restoration Project
Ventura County Watershed Protection District Matilija Dam Ecosystem Restoration Feasibility Study/Restoration Project
Ventura County Watershed Protection District EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study
Ventura County Watershed Protection District EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study
Ventura County Watershed Protection District Matilija Dam Ecosystem Restoration Project
Ventura County Watershed Protection District Matilija Dam Ecosystem Restoration Project
Ventura County Watershed Protection District EIS/EIR for the Matilija Dam Ecosystem Restoration Project Feasibility Study