SCH Number 2001092014


Project Info

Title
Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project
Description
The project proposes to extend light rail along Capitol Expressway between the Alum Rock Light Rail Station and the Eastridge Transit Center, a distance of approx 2.4 miles. In addition, VTA is proposing the following changes to the approved project: extension of the aerial guideway to grade-separate the Ocala Avenue and Cunningham Avenue intersections; revisions to the Capitol Expressway roadway lane configurations; modifications to the Eastridge Station platforms and track; reduction in parking spaces at Eastridge Park-and-Ride lot; relocation of PG&E Electrical Transmission Facilities, and extension of construction duration and modification to construction scenario.
Download CSV New Search

 

13 documents in project

Type Lead Agency Received Title
Santa Clara Valley Transportation Authority Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project
Santa Clara Valley Transportation Authority Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project
Santa Clara Valley Transportation Authority Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project
Santa Clara Valley Transportation Authority Capitol Expressway Corridor
Santa Clara Valley Transportation Authority Capitol Expressway Light Rail Project
Santa Clara Valley Transportation Authority Capitol Expressway Corridor
Santa Clara Valley Transportation Authority Capitol Expressway Corridor
Santa Clara Valley Transportation Authority Capitol Expressway Light Rail Project
Santa Clara Valley Transportation Authority Capitol Expressway Corridor
Santa Clara Valley Transportation Authority Capitol Expressway Light Rail Transit Project
Santa Clara Valley Transportation Authority Capitol Expressway Corridor
Santa Clara Valley Transportation Authority Capitol Expressway Corridor
Santa Clara Valley Transportation Authority Capitol Expressway Light Rail Transit Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.