Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project
18 Documents in Project
Summary
SCH Number
2001092014
Lead Agency
Santa Clara Valley Transportation Authority
Document Title
Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2019
Document Description
The following changes to the approved project are proposed: extension of the aerial guideway to grade-separate the Ocala Ave and Cunningham Ave intersections; revisions to Capitol Expressway roadway lane configurations; modifications to Eastridge Station platforms and track; reduction in parking spaces at Eastridge Park and-Ride lot; minor shift in the location and straightening of the Story Station pedestrian overcrossing; modification to Story Station pedestrian access; relocation of a construction staging area; relocation of PG&E electrical transmission facilities; and extension of construction duration and modification to the construction scenario.
Contact Information
Name
Christina Jaworski
Agency Name
Santa Clara Valley Transport. Auth.
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Santa Clara Valley Transportation Authority
Contact Types
Project Applicant
Location
Cities
San Jose
Counties
Santa Clara
Cross Streets
Capitol Expwy (Capitol Ave-Quimby Rd), City of San Jose, Santa Clara County
Notice of Determination
Approving Agency
Santa Clara Valley Transportation Authority
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.