Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project

15 Documents in Project

Summary

SCH Number
2001092014
Lead Agency
Santa Clara Valley Transportation Authority
Document Title
Eastridge to BART Regional Connector: Capitol Expressway Light Rail Project
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2020
Project Applicant
Santa Clara Valley Transportation Authority

Document Description
The proposed design changes are as follows: (1) Maintain an existing second left-turn lane on northbound Capitol Expressway at Ocala Avenue, (2) Add a supplemental feeder system and increase the size of two new traction power substations, (3) Modify PG&E electrical distribution service for two new traction power substations, (4) Provide in-lieu funds instead of replacing trees removed as part of Project, and (5) Include parking canopies with photovoltaic system at Eastridge Park-and-Ride Lot.

Contact Information
Christina Jaworski
Santa Clara VTA
3331 N. First St, Bldg. B-2
San Jose, CA 95134-1927

Phone : (408) 321-5751

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
Capitol Expwy (Capitol Ave-Quimby Rd)

Notice of Determination

Approving Agency
Santa Clara Valley Transportation Authority
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
3331 N. First St, Bldg. B-2, San Jose, CA 95134-1927

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2001092014_Eastridge to BART Regional Connector   PDF 1263 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print