Eastridge to BART Connector Project

18 Documents in Project

Summary

SCH Number
2001092014
Lead Agency
Santa Clara Valley Transportation Authority
Document Title
Eastridge to BART Connector Project
Document Type
NOD - Notice of Determination
Received
Posted
8/23/2023
Document Description
The project will extend light rail along Capitol Expressway between the existing Alum Rock Light Rail Station and Eastridge Transit Center, a distance of approximately 2.4 miles. Light rail will operate primarily in the median of Capitol Expressway within exclusive and semi-exclusive rights-of-way. To provide the additional right-of-way to accommodate light rail, high-occupancy vehicle lanes will be removed between Story Road and Tully Road. The project will include new light rail stations at Story Road (aerial) and Eastridge Transit Center (at-grade). The project will also include traction power substations at Ocala Avenue and Eastridge Transit Center. Relocation and replacement of a number of 115- kilovolt steel lattice electrical transmission towers with Tubular Steel Poles will be required for the project.

Contact Information

Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Assistant Deputy Director
Contact Types
Responsible Agency

Location

Cities
San Jose
Counties
Santa Clara
Regions
San Francisco Bay Area
State Highways
SR 130, Interstate 680
Other Location Info
The project is located along Capitol Avenue and Capitol Expressway between the Alum Rock Light Rail Station at Wilbur Avenue and the Eastridge Transit Center south of Tully Road in the City of San Jose in Santa Clara County.

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
Santa Clara Valley Transit Authority, River Oaks Building B Lobby, 3331 North First Street, San Jose, CA 95134.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Final Second Supplemental EIR, Second Addendum, Third Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.