SCH Number 2013082011
Project Info
- Title
- 5th Street Bridge Replacement Project
- Description
- To construct an access ramp on the Feather River right (west) bank landside levee. The access ramp will be 15 feet wide and include paved class 2 aggregate base; wo pipe gates (one 12-foot long across the access ramp and one 15 foot long across the access road); a removable bollard on the access ramp; pipe fencing; a 15 foot wide access road; approx. 80 feet of pavement resurfacing on Teegarden Ave.; removal of wood debris piles and on existing 83-foot long levee toe retaining wall; removal and replacement of a 40 foot chain link fence; and the removal of three Pacific Gas and Electric (PG&E) overhead electric poles, anchors, and lines.
13 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project (California Endangered Species Act Incidental Take Permit No. 2081-2016-022-02(ITP)) | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project | |
NOD | Yuba City | 5th Street Bridge Replacement Project (Streambed Alteration Agreement No. 1600-2016-0076-R2) | |
FON | Yuba City | 5th Street Bridge Replacement Project | |
MND | Yuba City | 5th Street Bridge Replacement Project |