5th Street Bridge Replacement Project
13 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013082011
- Lead Agency
- Yuba City
- Document Title
- 5th Street Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/4/2017
- Present Land Use
- Residential, Commercial, Industrial, Parkland, Open Space
- Document Description
- To relocate the CVIN, LLC dba Vast Networks fiber optic telecommunication line from the existing 5th Street Bridge to the new replacement bridge. The project includes removal and relocation of 2 vaults in conflict with the new bridge construction and replacement of conduits serving CVIN facilities in the new bridge and through the approach roadways.
- Contact Information
-
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave., Suite 170
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Coordinates
- 39°8'19"N 121°36'23"W
- Cities
- Marysville Yuba City
- Counties
- Sutter Yuba
- Cross Streets
- 5th Street and J Street, Bridge and Shasta Street
- Zip
- 95993
- Total Acres
- 165
- Parcel #
- Numerous
- State Highways
- Hwy 99 and 70
- Railways
- UPRR
- Airports
- O52, MYV
- Schools
- Multiple
- Waterways
- Feather River
- Township
- 15N
- Range
- 3E
- Section
- 23
- Base
- MDB&M
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave., Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.