5th Street Bridge Replacement Project

13 Documents in Project

Summary

SCH Number
2013082011
Lead Agency
Yuba City
Document Title
5th Street Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2018
Present Land Use
Residential, Commercial, Industrial, Parkland, Open Space
Document Description
To construct an access ramp on the Feather River right (west) bank landside levee. The access ramp will be 15 feet wide and include paved class 2 aggregate base; wo pipe gates (one 12-foot long across the access ramp and one 15 foot long across the access road); a removable bollard on the access ramp; pipe fencing; a 15 foot wide access road; approx. 80 feet of pavement resurfacing on Teegarden Ave.; removal of wood debris piles and on existing 83-foot long levee toe retaining wall; removal and replacement of a 40 foot chain link fence; and the removal of three Pacific Gas and Electric (PG&E) overhead electric poles, anchors, and lines.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Marysville, Yuba City
Counties
Sutter, Yuba
Cross Streets
5th Street and J Street, Bridge and Shasta Street
Zip
95993
Total Acres
165
Parcel #
Numerous
State Highways
Hwy 99 and 70
Railways
UPRR
Airports
O52, MYV
Schools
Multiple
Waterways
Feather River
Township
15N
Range
3E
Section
23
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print