Wildomar Shooting Range/Academy (Planning Application No. 19-0093)

Summary

SCH Number
2019109095
Lead Agency
Wildomar, City of (City of Wildomar)
Document Title
Wildomar Shooting Range/Academy (Planning Application No. 19-0093)
Document Type
MND - Mitigated Negative Declaration
Received
Project Applicant
City of Wildomar
Present Land Use
Light Industrial with Community Center overlay; Zoning: Rural-Residential (R-R).

Document Description
The project site is at 34020 Mission Trail, City of Wildomar in Riverside County and encompasses Assessor's Parcel Number (APN): 367-020-038. The project site is at the southwest corner of Bundy Canyon Road and Mission Trail and is located in the northwestern portion of the City of Wildomar, west of Interstate 15 (1-15). The proposed development includes a 38-foot tall (at its highest point) , two-story indoor shooting range/academy; the first floor would be 29,286 square feet and the second floor would be 5,503 square feet totaling to 34,789 square feet. The first floor would include offices, training and range areas, a lobby, gun smith and storage, shipping and receiving , and the second floor would include classrooms, storage, employee restrooms and lounge area, and VIP lounge and storage. A total of 77 parking spaces (4 ADA and 1 van accessible space included) would be provided . The existing vacant residence and associated structures would be demolished. The project includes the following applications for consideration by the Wildomar Planning Commission:

Contact Information
Matthew C. Bassi
City of Wildomar
23873 Clinton Keith Road, Suite.201
Wildomar, CA 92595

Phone : (951) 677-7751 ext. 213

Location

Cities
Wildomar
Counties
Riverside
Cross Streets
Mission Trail and Bundy Canyon Road
Zip
92595
Total Acres
2.33
Parcel #
367-020-038
State Highways
Interstate 15
Airports
French Valley, Skylark Field
Other Location Info
Schools: Jean Hayman Elementary School (0.55-mile north, closed), Elsinore High School (0.3-mile southeast), Faith Baptist Academy (0.4-mile southeast), Cornerstone Christian School (1.5 miles southeast), Grace Christian School (1 .85 miles southeast), California Lutheran High School (1 .7 miles southeast), Wildomar Elementary School (1 .8 miles southeast)

Notice of Completion

Review Period Start
Review Period End
Development Type
Educational (Shooting Academy/classrooms) Recreational (34,789 sq. ft.) Other (Shooting range/academy)
Local Action
General Plan Amendment Site Plan Rezone Use Permit Variance
Project Issues
Aesthetic/Visual Agricultural Land Air Quality Archaeologic-Historic Biological Resources Drainage/Absorption Economics/Jobs Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Minerals Noise Population/Housing Balance Public Services Recreation/Parks Schools/Universities Sewer Capacity Soil Erosion/Compaction/Grading Solid Waste Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Water Supply Wetland/Riparian Wildlife Growth Inducing Land Use Cumulative Effects
Reviewing Agencies
California Air Resources Board California Department of Fish and Wildlife, Inland Deserts Region 6 California Department of Forestry and Fire Protection California Department of Parks and Recreation California Department of Resources Recycling and Recovery California Department of Transportation, District 8 California Department of Water Resources California Highway Patrol California Native American Heritage Commission California Natural Resources Agency California Regional Water Quality Control Board, San Diego Region 9 Department of Toxic Substances Control Office of Historic Preservation

Attachments

Environmental Document
19-0093 Agency-Interested Person Letter [11-4-19]   DOCX 2855 K Appendix 1 - Project Development Plans   PDF 5663 K Appendix 10 - Preliminary WQMP Study   PDF 19977 K Appendix 11 - Geotech Infiltration Report   PDF 8873 K Appendix 12 - Noise Study   PDF 6060 K Appendix 13 - TIA and Memo   PDF 6521 K Appendix 2 - AQ Report and Memo   PDF 13258 K Appendix 3 - Biological Resource Assessment   PDF 11463 K Appendix 4 - MSHCP Consistency Analysis   PDF 6060 K Appendix 5 - Phase I Cultural Assessment   PDF 6961 K Appendix 6 - Geotech-Prelim   PDF 15650 K Appendix 7 - GHG Report   PDF 1488 K Appendix 8 - Phase I ESA   PDF 9999 K Appendix 9 - Preliminary Hydrology Report   PDF 10166 K NOI   PDF 96 K Summary Form   PDF 124 K Wildomar Shooting Range Initial Study   PDF 4231 K
NOC
NOC   PDF 750 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print