SCH Number 2013012079


Project Info

Title
Peninsula Corridor Electrification Project (PCEP) as Modified (Power lnterconnection)
Description
In 2015, the JPB certified the PCEP Final EIR. Since then, the design for the electrical interconnection from PG&E substations in South San Francisco and San Jose to the JPS substations has been revised. The JPS prepared an Addendum that found that the refined design would not result in any new or substantially more severe environmental impacts than disclosed in the Final EIR.
Download CSV New Search

 

12 documents in project

Type Lead/Public Agency Received Title
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project (Lake or Streambed Alteration Agreement No. EPIMSSMO-19998-R3)
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project (PCEP) as Modified (Power lnterconnection)
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project (PCEP) as Modified (PGE Substation and Interconnetions)
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project (PCEP) as modified (Pole Relocations)
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project (PCEP), as Modified (Paralleling Station 7, Variant C)
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project
Peninsula Corridor Joint Powers Board Peninsula Corridor Electrification Project