Peninsula Corridor Electrification Project (Lake or Streambed Alteration Agreement No. EPIMSSMO-19998-R3)
12 Documents in Project
Summary
SCH Number
2013012079
Lead Agency
Peninsula Corridor Joint Powers Board
Document Title
Peninsula Corridor Electrification Project (Lake or Streambed Alteration Agreement No. EPIMSSMO-19998-R3)
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2021
Document Description
The Project is limited to the pruning and removal of riparian vegetation for the electrical safety zone (ESZ) along the drainages and creeks crossing or paralleling the tracks for the installation of 130 to 140 single-track miles of overhead contact system (OCS) for the distribution of electrical power to the electric rolling stock.
Contact Information
Name
Will Kanz, Environmental Scientist
Agency Name
CDFW
Contact Types
Responsible Agency
Phone
Location
Cities
San Francisco
Counties
San Francisco, San Mateo
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Project is limited to the pruning and removal of riparian vegetation for the electrical safety zone (ESZ) along the drainages and creeks crossing or paralleling the tracks for the installation of 130 to 140 single-track miles of overhead contact system (OCS) for the distribution of electrical power to the electric rolling stock.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.