Peninsula Corridor Electrification Project (PCEP), as Modified (Paralleling Station 7, Variant C)

9 Documents in Project

Summary

SCH Number
2013012079
Lead Agency
Peninsula Corridor Joint Powers Board
Document Title
Peninsula Corridor Electrification Project (PCEP), as Modified (Paralleling Station 7, Variant C)
Document Type
NOD - Notice of Determination
Received
Posted
2/9/2016

Document Description
In 2015, the JPB certified the Final EIR for the PCEP. Since certification, the JPB has proposed one additional site location for PS7 (Variant C). PS7 Variant C would be located on a 0.11 acre site in San Jose on a small, triangular parcel of vacant land. This site is currently owned by UPRR. To access PS7, Variant C for construction and operation, the JPB would also acquire the parcel of land directly to the north on which there is an unnamed dirt path connecting to Almaden Rd. An Addendum that incorporates the mitigation measures from the Final EIR was prepared concludes the new PS7 location would not result in any new or substantially more severe environmental impacts that disclosed.

Contact Information
Stacy Cocke
Peninsula Corridor Joint Powers Board
1250 San Carlos Avenue
San Carlos, CA 94070-1306

Phone : (650) 508-6207

Location

Cities
San Jose
Counties
Santa Clara
Railways
Caltrain

Notice of Determination

Approving Agency
Peninsula Corridor Joint Powers Board (PCJPB)
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1250 San Carlos Ave, San Carlos, CA 94070

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes