Peninsula Corridor Electrification Project (PCEP) as modified (Pole Relocations)

12 Documents in Project

Summary

SCH Number
2013012079
Lead Agency
Peninsula Corridor Joint Powers Board
Document Title
Peninsula Corridor Electrification Project (PCEP) as modified (Pole Relocations)
Document Type
NOD - Notice of Determination
Received
Posted
10/10/2017
Document Description
After the 2015 PCEP Final EIR was certified, the CA High Speed Rail Authority completed preliminary design of the Caltrain Corridor rail alignment and requested the JPB consider minor changes in the overhead contact systems (OCS) alignment to reduce later relocation of OCS poles if and when their project is constructed. The JPB prepared an Addendum that identified that certain minor shifts in the OCS alignment would be accomplished without resulting in new or substantially more severe impacts than disclosed in the FEIR.

Contact Information

Name
Stacy Cocke
Agency Name
Peninsula Corridor Joints Powers Board
Contact Types
Lead/Public Agency

Location

Counties
Santa Clara
Railways
Caltrain

Notice of Determination

Approving Agency
Peninsula Corridor Joint Powers Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print