SCH Number 2010051055


Project Info

Title
Baker Water Treatment Plant Project
Description
IRWD has prepared Addendum No. 3 to the FEIR for the Baker Water Treatment Plant Project. IRWD proposes to modify the project to include construction and operation of a solar photovoltaic power generation system and energy storage system within the existing boundaries of the Baker WTP. The project would supplement electricity provided by SCE with solar energy captured onsite to reduce the cost of power at the Baker WTP. The project would also charge the storage system batteries from the grid during off-peak hours and discharge them during on-peak times.
Download CSV New Search

 

7 documents in project

Type Lead/Public Agency Received Title
Irvine Ranch Water District Baker Water Treatment Plant
Irvine Ranch Water District Baker Water Treatment Plant Project
Irvine Ranch Water District Construction and Operation of the Baker Water Treatment Plant
Irvine Ranch Water District Baker Water Treatment Plant Project
Irvine Ranch Water District Baker Water Treatment Plant Project
Irvine Ranch Water District Baker Water Treatment Plant Project
Irvine Ranch Water District Baker Water Treatment Plant Project