Baker Water Treatment Plant Project

7 Documents in Project

Summary

SCH Number
2010051055
Lead Agency
Irvine Ranch Water District
Document Title
Baker Water Treatment Plant Project
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2012
Present Land Use
Public Facilities; Residential; Open Space Park
Document Description
Irvine Ranch Water District (IRWD) has prepared Addendum No. 1 to the Final Environmental Impact Report (EIR) for the Baker Water Treatment Plant (WTP) Project. The proposed modifications include changes to the alignment of the treated water pipeline that connects the Baker WTP to the South County Pipeline and changes to the mechanical design of the product water pump station (PWPS). The footprint and design of the PWPS building would not change from that described in the Final EIR. The modified alignment for the proposed treated water pipeline would run from the south corner of the Baker site, cross under the Allen McColloch Pipeline (AMP) and IRWD's Lake Forest Zone 1 and Zone 2 pipeline, run parallel to the Project's sewer pipeline alignment, then into the rights-of-way of Forestwood, Autumnwood, Palmwood, and Peachwood. A connection to the South County Pipeline would be constructed near the Peachwood-Palmwood intersection.

Contact Information

Name
Paul Weghorst
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency

Location

Cities
Orange
Counties
Orange
Cross Streets
Wisteria Lane and Palmwood Drive, Lake Forest
Zip
92630
Total Acres
8
State Highways
Hwy 241
Railways
BNSF/Metrolink
Airports
El Toro MCAS (decommissioned)
Schools
Lake Forest Montessori, Fullbright Montessori, Rancho Canada ES
Waterways
Serrano Creek, Peters Canyon Reservoir
Other Location Info
City/Nearest Community: Orange, Lake Forest

Notice of Determination

Approving Agency
Irvine Ranch Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print