Baker Water Treatment Plant Project

6 Documents in Project

Summary

SCH Number
2010051055
Lead Agency
Irvine Ranch Water District
Document Title
Baker Water Treatment Plant Project
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2018
Present Land Use
Public Facilities; Residential; Open Space Park

Document Description
IRWD has prepared Addendum No. 3 to the FEIR for the Baker Water Treatment Plant Project. IRWD proposes to modify the project to include construction and operation of a solar photovoltaic power generation system and energy storage system within the existing boundaries of the Baker WTP. The project would supplement electricity provided by SCE with solar energy captured onsite to reduce the cost of power at the Baker WTP. The project would also charge the storage system batteries from the grid during off-peak hours and discharge them during on-peak times.

Contact Information
Jo Ann Corey
Irvine Ranch Water District
15600 Sand Canyon Blvd.
Irvine, CA 92618

Phone : (949) 453-5300

Location

Coordinates
33°39'22.3"N 117°41'01.8"W
Cities
Orange
Counties
Orange
Cross Streets
Wisteria Lane and Palmwood Drive, Lake Forest
Zip
92630
Total Acres
8
State Highways
Hwy 241
Railways
BNSF/Metrolink
Airports
El Toro MCAS (decommissioned)
Schools
Lake Forest Montessori, Fullbright Montessori, Rancho Canada ES
Waterways
Serrano Creek, Peters Canyon Reservoir
Other Location Info
City/Nearest Community: Orange, Lake Forest

Notice of Determination

Approving Agency
Irvine Ranch Water District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
15600 Sand Canyon Blvd., Irvine, CA 92618

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes