Baker Water Treatment Plant Project

7 Documents in Project

Summary

SCH Number
2010051055
Lead Agency
Irvine Ranch Water District
Document Title
Baker Water Treatment Plant Project
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2013
Present Land Use
Public Facilities; Residential; Open Space Park
Document Description
Irvine Ranch Water District (IRWD) has prepared Addendum No. 2 to the Final Environmental Impact Report (EIR) for the Baker Water Treatment Plant (WTP) Project. The proposed modifications include an addition to the treatment process at the Baker WTP and two new electrical conduit alignments necessary for Southern California Edison (SCE) to service the Project. The treatment process at the Baker WTP would be modified to include new residuals handling facilities that would allow residuals processing to occur onsite at the Baker WTP rather than at Los Alisos Water Recycling Plant (LAWRP) as previously planned. For the new electrical conduit alignments, one would serve the Baker WTP in the City of Lake Forest, and the other would serve the planned Raw Water Pump Station in the City of Orange.

Contact Information

Name
Paul Weghorst
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency

Location

Cities
Orange
Counties
Orange
Cross Streets
Wisteria Lane and Palmwood Drive, Lake Forest
Zip
92630
Total Acres
8
State Highways
Hwy 241
Railways
BNSF/Metrolink
Airports
El Toro MCAS (decommissioned)
Schools
Lake Forest Montessori, Fullbright Montessori, Rancho Canada ES
Waterways
Serrano Creek, Peters Canyon Reservoir
Other Location Info
City/Nearest Community: Orange, Lake Forest

Notice of Determination

Approving Agency
Irvine Ranch Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.