SCH Number 2009111098


Project Info

Title
Shipyard Sediment Remediation Project San Diego Bay
Description
The Project Modifications to the originally-approved remediation project will include the following: (1) installation of a permanent sheetpile bulkhead wall; (2) removal of a submerged sheetpile wall and marine railway debris from the bay bottom; (3) removal of the existing approximately 5,140-square-foot Pier 2 structure from BAE Systems' leasehold; (4) elimination of on-site dredge handling by transferring sediment from barge or scow directly to trucks; and, (5 increasing the total permitted dredge volume from 90,800 to 105,800 cubic yards.
Download CSV New Search

 

9 documents in project

Type Lead/Public Agency Received Title
Regional Water Quality Control Board, Region 9 San Diego Shipyard Sediment Remediation Project - North Shipyard (for Project Modifications)
Regional Water Quality Control Board, Region 9 San Diego Shipyard Environmental Restoration Fund - NASSCO (South)
Regional Water Quality Control Board, Region 9 San Diego Shipyard Environmental Restoration Fund - NASSCO (South)
Regional Water Quality Control Board, Region 9 San diego Shipyard Environmental Remediation Project - South Shipyard
Regional Water Quality Control Board, Region 9 San Diego Shipyard Environmental Restoration Fund - NASSCO (South)
Regional Water Quality Control Board, Region 9 San Diego Shipyard Environmental Restoration Fund - BAE (North)
Regional Water Quality Control Board, Region 9 Nassco/BAE Shipyard Sediment Site, San Diego Bay
Regional Water Quality Control Board, Region 9 Shipyard Sediment Remediation Project San Diego Bay
Regional Water Quality Control Board, Region 9 Nassco/BAE Shipyard Sediment Site, San Diego Bay