San diego Shipyard Environmental Remediation Project - South Shipyard
9 Documents in Project
Summary
SCH Number
2009111098
Lead Agency
Regional Water Quality Control Board, Region 9
Document Title
San diego Shipyard Environmental Remediation Project - South Shipyard
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2013
Present Land Use
Industrial/San Diego Unified Port District
Document Description
The Project includes the dredging of, or application of a clean sand over, contaminated sediment; transporting, dewatering, stockpiling, and testing of dredge materials and effluent at a landslide stockpiling location; treatment (if needed) and discharge of the effluent; truck transport of dredge materials to appropriate landfill disposals facilities; and demolition of an existing pier. The amount of sediment to be removed will total approximately 52,600 cubic yards (cy), and an estimated 2,600 cy of debris will also be removed during dredging in this area.
Contact Information
Name
Mayra Medel
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Diego
Counties
San Diego
Cross Streets
West of Sampson Street & Harbor Drive
Zip
92113
Total Acres
17.5
State Highways
I-5
Railways
SD&AE RR, BNSF RR
Airports
San Diego International
Schools
Perkins Elementary
Waterways
San Diego Bay
Township
17S
Range
3W
Base
SBB&M
Notice of Determination
Approving Agency
San Diego Unified Port District
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.