California High-Speed Rail Project: San Jose to Merced Project Section

2 Documents in Project

Summary

SCH Number
2009022083
Lead Agency
High Speed Rail Authority, California (California High Speed Rail Authority)
Document Title
California High-Speed Rail Project: San Jose to Merced Project Section
Document Type
JD - Joint Document
Received
Project Applicant
California High Speed Rail Authority
Present Land Use
Mix of urbanized uses (residential/commercial/industrial), transportation uses, and rural uses (agriculture, open space)

Document Description
The California High-Speed Rail Authority (Authority) certified a Statewide Program Environmental Impact Report/Environmental Impact Statement (EIR/EIS) (Tier 1) in November 2005 as the first phase of a tiered environmental review process for the proposed California High-Speed Rail (HSR) System planned to provide a reliable, high-speed, electric-powered rail system that links the major metropolitan areas of the state and that delivers predictable and consistent travel times. A further objective is to provide an interface with commercial airports, mass transit, and the highway network and to relieve capacity constraints of the existing transportation system as increases in intercity travel demand in California occur, in a manner sensitive to and protective of California's unique natural resources. A second program-level (Tier 1) EIR/EIS was completed in 2008 focusing on the connection between the Bay Area and Central Valley; the Authority revised this document under CEQA and completed it in 2012. Based on the Program EIR/EISs, the Authority selected preferred corridors and station locations to advance for further study.

Contact Information
Mark A. McLoughlin
California High-Speed Rail Authority
770 L Street, Suite 620 MS-1
Sacramento, CA 95814

Phone : (916) 403-6934

Location

Cities
Glory Los Banos Morgan Hill San Jose Santa Clara
Counties
Merced San Benito Santa Clara
Cross Streets
See Attachments
Zip
Various
Total Acres
~145 Miles
Railways
Caltrain, UPRR
Schools
Multiple
Waterways
Multiple
Other Location Info
State Highway: 33, 85, 87, 89, 1s2. 16s, US 101 , I-5. 1-280, 1-880 Airports: SJC, South County Airport, Frazier Lake, Los Banos

Notice of Completion

Review Period Start
Review Period End
Development Type
Transportation (Rail (high-speed train))
Local Action
Public Works
Project Issues
Aesthetic/Visual Agricultural Land Air Quality Archaeologic-Historic Biological Resources Drainage/Absorption Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Minerals Noise Population/Housing Balance Public Services Recreation/Parks Schools/Universities Sewer Capacity Soil Erosion/Compaction/Grading Solid Waste Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Water Supply Wetland/Riparian Growth Inducing Land Use Cumulative Effects Other EMF/EMI, Vibration, Safety & Security
Reviewing Agencies
California Air Resources Board California Department of Fish and Wildlife, Bay Delta Region 3 California Department of Forestry and Fire Protection California Department of Parks and Recreation California Department of Pesticide Regulation California Department of Resources Recycling and Recovery California Department of Transportation, District 10 California Department of Transportation, District 4 California Department of Transportation, District 5 California Department of Transportation, Division of Aeronautics California Department of Water Resources California Energy Commission California Governor's Office of Emergency Services California Native American Heritage Commission California Natural Resources Agency California Regional Water Quality Control Board, Central Coast Region 3 California Regional Water Quality Control Board, Central Valley Fresno Region 5 California Regional Water Quality Control Board, Central Valley Sacramento Region 5 California Regional Water Quality Control Board, San Francisco Bay Region 2 California State Lands Commission Central Valley Flood Protection Board Delta Stewardship Council Department of Corrections Department of General Services Office of Historic Preservation State Water Resources Control Board, Division of Water Quality Department of Toxic Substances Control California Highway Patrol California Department of Conservation California Department of Fish and Wildlife, Central Region 4 California Public Utilities Commission

Attachments

Environmental Document
_Memo   PDF 1200 K CA High Speed Rail, NOC Attachment for SJ to Merced DEIR   PDF 1106 K Draft_EIRS_JM_V1-00_Cover_Volume_I   PDF 495 K Draft_EIRS_JM_V1-01_Title_Page_Volume_I   PDF 94 K Draft_EIRS_JM_V1-02_Signature_Page_Volume_I   PDF 397 K Draft_EIRS_JM_V1-03_Table_of_Contents_Volume_1   PDF 485 K Draft_EIRS_JM_V1-04_Fact_Sheet   PDF 361 K Draft_EIRS_JM_V1-05_Preface   PDF 178 K Draft_EIRS_JM_V1-06_Summary   PDF 4789 K Draft_EIRS_JM_V1-07_CH_1_Purpose_Need_Objectives   PDF 2085 K Draft_EIRS_JM_V1-08_CH_2_Alternatives   PDF 26969 K Draft_EIRS_JM_V1-09_CH_3   PDF 937 K Draft_EIRS_JM_V1-10_CH_3   PDF 28043 K Draft_EIRS_JM_V1-11_CH_3   PDF 3663 K Draft_EIRS_JM_V1-12_CH_3   PDF 17444 K Draft_EIRS_JM_V1-13_CH_3   PDF 1821 K Draft_EIRS_JM_V1-14_CH_3   PDF 4933 K Draft_EIRS_JM_V1-15_CH_3   PDF 3946 K Draft_EIRS_JM_V1-16_CH_3   PDF 41006 K Draft_EIRS_JM_V1-17_CH_3   PDF 36068 K Draft_EIRS_JM_V1-18_CH_3   PDF 3082 K Draft_EIRS_JM_V1-19_CH_3   PDF 5274 K Draft_EIRS_JM_V1-20_CH_3   PDF 3923 K Draft_EIRS_JM_V1-21_CH_3   PDF 7233 K Draft_EIRS_JM_V1-22_CH_3   PDF 4177 K Draft_EIRS_JM_V1-23_CH_3   PDF 17095 K Draft_EIRS_JM_V1-24_CH_3   PDF 37382 K Draft_EIRS_JM_V1-25_CH_3   PDF 3535 K Draft_EIRS_JM_V1-26_CH_3   PDF 966 K Draft_EIRS_JM_V1-27_CH_3   PDF 1412 K Draft_EIRS_JM_V1-28_CH_3   PDF 968 K Draft_EIRS_JM_V1-29_CH_4_Section_4f-6f   PDF 27032 K Draft_EIRS_JM_V1-30_CH_5_Environmental_Justice   PDF 9454 K Draft_EIRS_JM_V1-31_CH_6_Project_Costs_and_Operations   PDF 918 K Draft_EIRS_JM_V1-32_CH_7_Other_NEPA_CEQA_Considerations   PDF 600 K Draft_EIRS_JM_V1-33_CH_8_Preferred_Alternative   PDF 998 K Draft_EIRS_JM_V1-34_CH_9_Public_Agency_Involvement   PDF 819 K Draft_EIRS_JM_V1-35_CH_10_Distribution_List   PDF 667 K Draft_EIRS_JM_V1-36_CH_11_List_Preparers   PDF 680 K Draft_EIRS_JM_V1-37_CH_12_References   PDF 2034 K Draft_EIRS_JM_V1-38_CH_13_Glossary   PDF 769 K Draft_EIRS_JM_V1-39_CH_14_Index   PDF 778 K Draft_EIRS_JM_V1-40_CH_15_Acronyms_and_Abbreviations   PDF 626 K Draft_EIRS_JM_V2-00_Cover_Volume_2   PDF 489 K Draft_EIRS_JM_V2-01_Title_Page_Volume_2   PDF 106 K Draft_EIRS_JM_V2-02_Table_of_Contents_Volume_2   PDF 88 K Draft_EIRS_JM_V2-03_APP_2-A_Roadway_Crossings_Modifications_Closures   PDF 2001 K Draft_EIRS_JM_V2-04_APP_2-B_Railroad_Crossings   PDF 147 K Draft_EIRS_JM_V2-05_APP_2-C_Operations_Service_Plan_Summary   PDF 2651 K Draft_EIRS_JM_V2-06_APP_2-D_Applicable_Design_Standards   PDF 4442 K Draft_EIRS_JM_V2-07_APP_2-E_Project_Impact_Avoidance_Minimization_Features   PDF 466 K Draft_EIRS_JM_V2-08_APP_2-F_PGE_Network_Upgrades   PDF 864 K Draft_EIRS_JM_V2-09_APP_2-G_Summary_Requirements_Operations_Maintenance_Facilities   PDF 3353 K Draft_EIRS_JM_V2-10_APP_2-H_Emergency_Safety_Plans   PDF 13956 K Draft_EIRS_JM_V2-11_APP_2-I_Alternatives_Considered_During_Alternative_Screening_Process   PDF 22361 K Draft_EIRS_JM_V2-12_APP_2-J_Regional_Local_Plans_Policies   PDF 1627 K Draft_EIRS_JM_V2-13_APP_2-K_Policy_Consistency_Analysis   PDF 556 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report   PDF 4148 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_A   PDF 1965 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_B   PDF 1726 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_C   PDF 604 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_D_Part_1   PDF 28473 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_D_Part_2   PDF 28045 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_E   PDF 156 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_F   PDF 3241 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_G   PDF 6479 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_H_1   PDF 6061 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_H_2   PDF 35564 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_H_3   PDF 8964 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_H_4   PDF 12031 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_H_5   PDF 21635 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_H_6   PDF 19312 K Draft_EIRS_JM_V2-14_APP_2-L_Constructability_Assessment_Report_App_H_7   PDF 29313 K Draft_EIRS_JM_V2-15_APP_3   PDF 23905 K Draft_EIRS_JM_V2-15_APP_3   PDF 34778 K Draft_EIRS_JM_V2-15_APP_3   PDF 31123 K Draft_EIRS_JM_V2-15_APP_3   PDF 22793 K Draft_EIRS_JM_V2-15_APP_3   PDF 21271 K Draft_EIRS_JM_V2-15_APP_3   PDF 28051 K Draft_EIRS_JM_V2-15_APP_3   PDF 33301 K Draft_EIRS_JM_V2-15_APP_3   PDF 20428 K Draft_EIRS_JM_V2-16_APP_3   PDF 1772 K Draft_EIRS_JM_V2-16_APP_3   PDF 15190 K Draft_EIRS_JM_V2-17_APP_3   PDF 441 K Draft_EIRS_JM_V2-17_APP_3   PDF 423 K Draft_EIRS_JM_V2-17_APP_3   PDF 321 K Draft_EIRS_JM_V2-17_APP_3   PDF 468 K Draft_EIRS_JM_V2-17_APP_3   PDF 1466 K Draft_EIRS_JM_V2-17_APP_3   PDF 198 K Draft_EIRS_JM_V2-17_APP_3   PDF 424 K Draft_EIRS_JM_V2-17_APP_3   PDF 9320 K Draft_EIRS_JM_V2-18_APP_3   PDF 3830 K Draft_EIRS_JM_V2-19_APP_3   PDF 796 K Draft_EIRS_JM_V2-20_APP_3   PDF 33092 K Draft_EIRS_JM_V2-20_APP_3   PDF 617 K Draft_EIRS_JM_V2-20_APP_3   PDF 4150 K Draft_EIRS_JM_V2-20_APP_3   PDF 25871 K Draft_EIRS_JM_V2-21_APP_3   PDF 671 K Draft_EIRS_JM_V2-22_APP_3   PDF 18771 K Draft_EIRS_JM_V2-23_APP_3   PDF 1200 K Draft_EIRS_JM_V2-24_APP_3   PDF 223 K Draft_EIRS_JM_V2-25_APP_3   PDF 337 K Draft_EIRS_JM_V2-26_APP_3   PDF 517 K Draft_EIRS_JM_V2-27_APP_3   PDF 335 K Draft_EIRS_JM_V2-28_APP_3   PDF 201 K Draft_EIRS_JM_V2-29_APP_3   PDF 8849 K Draft_EIRS_JM_V2-30_APP_3   PDF 43460 K Draft_EIRS_JM_V2-31_APP_3   PDF 27249 K Draft_EIRS_JM_V2-32_APP_3   PDF 1112 K Draft_EIRS_JM_V2-33_APP_3   PDF 10916 K Draft_EIRS_JM_V2-34_APP_3   PDF 239 K Draft_EIRS_JM_V2-35_APP_3   PDF 1026 K Draft_EIRS_JM_V2-36_APP_3   PDF 2134 K Draft_EIRS_JM_V2-37_APP_3   PDF 11921 K Draft_EIRS_JM_V2-38_APP_3   PDF 309 K Draft_EIRS_JM_V2-38_APP_3   PDF 403 K Draft_EIRS_JM_V2-38_APP_3   PDF 313 K Draft_EIRS_JM_V2-38_APP_3   PDF 247 K Draft_EIRS_JM_V2-38_APP_3   PDF 372 K Draft_EIRS_JM_V2-38_APP_3   PDF 403 K Draft_EIRS_JM_V2-38_APP_3   PDF 227 K Draft_EIRS_JM_V2-39_APP_3   PDF 2827 K Draft_EIRS_JM_V2-40_APP_3   PDF 287 K Draft_EIRS_JM_V2-41_APP_3   PDF 2155 K Draft_EIRS_JM_V2-42_APP_3   PDF 276 K Draft_EIRS_JM_V2-43_APP_3   PDF 574 K Draft_EIRS_JM_V2-44_APP_3   PDF 17995 K Draft_EIRS_JM_V2-45_APP_3   PDF 747 K Draft_EIRS_JM_V2-46_APP_3   PDF 2291 K Draft_EIRS_JM_V2-46_APP_3   PDF 379 K Draft_EIRS_JM_V2-47_APP_3   PDF 799 K Draft_EIRS_JM_V2-48_APP_3   PDF 752 K Draft_EIRS_JM_V2-49_APP_4   PDF 637 K Draft_EIRS_JM_V2-50_APP_5   PDF 620 K Draft_EIRS_JM_V2-51_APP_5   PDF 565 K Draft_EIRS_JM_V2-51_APP_5   PDF 502 K Draft_EIRS_JM_V2-51_APP_5   PDF 2743 K Draft_EIRS_JM_V2-51_APP_5   PDF 1109 K Draft_EIRS_JM_V2-52_APP_6   PDF 2280 K Draft_EIRS_JM_V2-53_APP_6   PDF 584 K Draft_EIRS_JM_V2-54_APP_9   PDF 476 K Draft_EIRS_JM_V3-00_Cover_Volume_III   PDF 5350 K Draft_EIRS_JM_V3-01_Title_Page_Volume_III   PDF 102 K Draft_EIRS_JM_V3-02_General_Information_Volume_III   PDF 31511 K Draft_EIRS_JM_V3-03_PEPD_Alternative_1_Book_1_A_Composite_Plan_Profile_and_Cross_Sections   PDF 34599 K Draft_EIRS_JM_V3-04_PEPD_Alternative_1_Book_1_B_Composite_Plan_Profile_and_Cross_Sections_Stations_Structures   PDF 35634 K Draft_EIRS_JM_V3-05_PEPD_Alternative_1_Book_1_C_Roadway_Maintenance_of_Way_Tunnels   PDF 34015 K Draft_EIRS_JM_V3-06_PEPD_Alternative_1_Book_1_D_Construction_Staging_Alignment_Data_Tables   PDF 30673 K Draft_EIRS_JM_V3-07_PEPD_Alternative_2_Book_2_A_Composite_Plan_Profile_and_Cross_Sections   PDF 22963 K Draft_EIRS_JM_V3-08_PEPD_Alternative_2_Book_2_B_Composite_Plan_Profile_and_Cross_Sections_Stations_Structures   PDF 29605 K Draft_EIRS_JM_V3-09_PEPD_Alternative_2_Book_2_C_Roadway   PDF 24674 K Draft_EIRS_JM_V3-10_PEPD_Alternative_2_Book_2_D_Roadway_Maintenance_of_Way_Tunnels   PDF 24421 K Draft_EIRS_JM_V3-11_PEPD_Alternative_2_Book_2_E_Construction_Staging_Alignment_Data_Tables   PDF 36858 K Draft_EIRS_JM_V3-12_PEPD_Alternative_3_Book_3_A_Composite_Plan_Profile_and_Cross_Sections   PDF 34478 K Draft_EIRS_JM_V3-13_PEPD_Alternative_3_Book_3_B_Composite_Plan_Profile_and_Cross_Sections_Stations   PDF 27546 K Draft_EIRS_JM_V3-14_PEPD_Alternative_3_Book_3_C_Structures_Roadway   PDF 27625 K Draft_EIRS_JM_V3-15_PEPD_Alternative_3_Book_3_D_Roadway_Maintenance_of_Way_Tunnels   PDF 29859 K Draft_EIRS_JM_V3-16_PEPD_Alternative_3_Book_3_E_Construction_Staging   PDF 31451 K Draft_EIRS_JM_V3-17_PEPD_Alternative_3_Book_3_F_Alignment_Data_Tables   PDF 15446 K Draft_EIRS_JM_V3-18_PEPD_Alternative_4_Book_4_A_Composite_Plan_Profile_and_Cross_Sections   PDF 32790 K Draft_EIRS_JM_V3-19_PEPD_Alternative_4_Book_4_B_Composite_Plan_Profile_and_Cross_Sections   PDF 26351 K Draft_EIRS_JM_V3-20_PEPD_Alternative_4_Book_4_C_Stations   PDF 30552 K Draft_EIRS_JM_V3-21_PEPD_Alternative_4_Book_4_D_Structures_Roadway_Maintenance_of_Way   PDF 18670 K Draft_EIRS_JM_V3-22_PEPD_Alternative_4_Book_4_E_Tunnels_Construction_Staging_Alignment_Data_Tables   PDF 33346 K NOA   PDF 2169 K
NOC
NOC   PDF 1334 K
State Comments
2009022083_CDFW Comment   PDF 507 K 2009022083_CHP Comment   PDF 283 K 2009022083_Conservation Comment   PDF 1798 K 2009022083_DTSC Comment   PDF 175 K 2009022083_PUC Comment   PDF 232 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print