SCH Number 2023020081
Project Info
- Title
- Sly Park Intertie Improvements Project
- Description
- The District is proposing to replace approximately 4.5 miles of existing 22-inch and 24-inch diameter steel pipeline with a concrete mortar steel pipeline ranging from 12 to 36-inches in diameter and constructed with a protective exterior coating and cathodic protection system. The proposed project would upgrade the existing Sly Park Intertie (SPI) raw water system to a treated potable water conveyance system. Drinking water would be conveyed by gravity from the District's Reservoir 1 to Reservoir A treatment plant and a new pump station with a backup power supply generator would be constructed at the Reservoir A facility to convey drinking water in the reverse direction from Reservoir A to Reservoir.
6 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | El Dorado Irrigation District | Sly Park Intertie Improvements Project | |
NOD | El Dorado Irrigation District | Sly Park Intertie Improvements Project (Lake or Streambed Alteration Agreement No. ELD-43674-R2) | |
NOD | El Dorado Irrigation District | Notice of Determination-Sly Park Intertie Improvements Project | |
FIN | El Dorado Irrigation District | Sly Park Intertie Improvements Project Final EIR | |
EIR | El Dorado Irrigation District | Sly Park Intertie Improvements Project | |
NOP | El Dorado Irrigation District | Sly Park Intertie Replacement PRoject |