SCH Number 2023020081


Project Info

Title
Sly Park Intertie Improvements Project
Description
The District is proposing to replace approximately 4.5 miles of existing 22-inch and 24-inch diameter steel pipeline with a concrete mortar steel pipeline ranging from 12 to 36-inches in diameter and constructed with a protective exterior coating and cathodic protection system. The proposed project would upgrade the existing Sly Park Intertie (SPI) raw water system to a treated potable water conveyance system. Drinking water would be conveyed by gravity from the District's Reservoir 1 to Reservoir A treatment plant and a new pump station with a backup power supply generator would be constructed at the Reservoir A facility to convey drinking water in the reverse direction from Reservoir A to Reservoir.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
El Dorado Irrigation District Notice of Determination-Sly Park Intertie Improvements Project
El Dorado Irrigation District Sly Park Intertie Improvements Project Final EIR
El Dorado Irrigation District Sly Park Intertie Improvements Project
El Dorado Irrigation District Sly Park Intertie Replacement PRoject