Notice of Determination-Sly Park Intertie Improvements Project
6 Documents in Project
Summary
SCH Number
2023020081
Lead Agency
El Dorado Irrigation District
Document Title
Notice of Determination-Sly Park Intertie Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2024
Document Description
The project will replace approximately 6 miles of existing deteriorated pipeline with a 12- to 24-inch concrete mortar steel pipeline. The project will upgrade the existing raw water system to a treated potable water conveyance system. Drinking water would be conveyed by gravity from Reservoir 1 to Reservoir A treatment plant and a new pump station with backup power supply generator would be constructed at the Reservoir A facility to convey drinking water from Reservoir A to Reservoir 1.
Contact Information
Name
Doug Venable
Agency Name
El Dorado Irrigation District
Job Title
Environmental Review Analyst
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Pollock Pines
Counties
El Dorado
Regions
Countywide
Cross Streets
Ridgeway Drive, Starkes Grade Road, Sly Park Road
Zip
95726
Total Acres
33
Parcel #
N/A
State Highways
HWY 50
Railways
N/A
Airports
N/A
Schools
Pinewood Elementary School
Waterways
North & South Fork Weber Creek, North Fork Clear Creek, Clear Creek
Township
10N
Range
12,13E
Section
13,18
Base
M.D.M
Notice of Determination
Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
2890 Mosquito Road, Placerville, CA 95667
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.