Sly Park Intertie Improvements Project (Lake or Streambed Alteration Agreement No. ELD-43674-R2)

5 Documents in Project

Summary

SCH Number
2023020081
Lead Agency
El Dorado Irrigation District
Document Title
Sly Park Intertie Improvements Project (Lake or Streambed Alteration Agreement No. ELD-43674-R2)
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2024
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement No. ELD-43674-R2), pursuant to section 1602 of the Fish and Game Code to the project Applicant, El Dorado Irrigation District. The project is limited to the replacement of Segment 2 pipeline, consisting of approximately 3 miles of 22- to 24-inch diameter pipeline. The five drainage crossings within this 3-mile stretch include North Fork Weber Creek, an unnamed drainage culvert on Starks Grade Road, South Fork Weber Creek, North Fork Clear Creek, and South Fork Clear Creek. The existing pipeline will be replaced with an upgraded 12- to 24-inch cement, mortar-lined pipeline that would be installed with standard interior and exterior protective coatings and a cathodic protection system. Project activities would involve open-cut trenching to access and remove the existing pipeline and install the new pipeline within the existing alignment, to the extent feasible. The construction corridor width would be approximately 30 feet (15 feet on either side of the current alignment). A temporary diversion dam would be installed to bypass flows, if present, to dewater the work area during construction. The temporary diversion structures would be constructed using gravel bags or a similar structure covered with an impermeable membrane.

Contact Information

Name
Caitlyn Oswalt
Agency Name
CALIFORNIA DEPARTMENT OF FISH &WILDLIFE
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
El Dorado
Regions
Northern California
Other Location Info
Located at North Fork Weber Creek, South Fork Weber Creek, North Fork Clear Creek, and Clear Creek; Approximately 4.5-miles in the Pollock Pines community; crosses multiple public and private parcels from Ridgeway Drive to Sly Park Road

Notice of Determination

Approving Agency
CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE
Approving Agency Role
Responsible Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
CDFW Region 2 Office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print