SCH Number 2019049138


Project Info

Title
2017 Storm Damage DWR Rehabilitation - Phase 4 and 5 Repair Sites
Description
DWR implemented the 2017 Storm Damage DWR Emergency Rehabilitation Program for emergency repair sites in Phases 1 through 3 in 2017 and 2018. The purpose of the proposed project in this IS/MND is to address additional non-emergency sites (Phases 4 and 5) identified for repair in 2019/2020. The previous emergency repairs under Phases 1 through 3 did not require CEQA because those sites met the Statutory Exemption under the CEQA Guidelines Section 15269 criteria for emergency projects that are necessary to maintain levee structures essential to public health, safety and welfare due to the potential for levee failures without the repairs during the 2017/2018 phases. The proposed project includes a total of 30 repair sites located in Yolo, Sutter, Tehama, Butte, Colusa, Glenn, San Joaquin, and Sacramento counties. The proposed project would repair and rehabilitate levees at the 30 locations using a variety of construction equipment, requiring different design considerations based on levee conditions. The repair and rehabilitation would be scheduled to occur within a permitted time period to avoid impacts on special-status species and wet weather conditions. Construction activities would take place at each site throughout the summer/fall of 20'19 or 2020 (from July 2 through November 1). Each levee sue would require approximately 2 to 4 weeks of active construction. All work would take place during daylight hours, and no nighttime lighting would be required. The maximum length of the work day would be 5 a.m. to 8 p.m. depending on allowable daylight Noise ordinances would be followed for sites located in residential areas. At least three sites would be repaired concurrently, with up to nine sites being repaired at the same time, based on limitations of hauling, air quality permitting, and other potential permit restrictions by responsible agencies. DWR has incorporated environmental commitments into the proposed project that include conservation measures and/or best management practices developed in coordination with the responsible resources agencies to avoid, minimize and/or provide compensation for effects on biological resources. DWR would implement these environmental commitments as part of the proposed project construction activities. These commitments would be satisfied even if not separately imposed by permitting agencies and, if permitting agencies impose additional measures or modifications, those would also be adhered to as part of the permit(s).
Download CSV New Search

 

13 documents in project

Type Lead/Public Agency Received Title
California Department of Water Resources (DWR) Minor Alteration No. WA2024036 – 2017 Storm Damage DWR Emergency Repairs (SDDER) - Site 91
California Department of Water Resources (DWR) Minor Alteration No. WA2024030 – 2017 SDDER Site 97 on Sacramento River
California Department of Water Resources (DWR) 2017 Storm Damage DWR Rehabilitation: Phase 6 at Sites 90, 91, 92, 93, 94, and 97 Project
California Department of Water Resources (DWR) 2017 Storm Damage DWR Rehabilitation – Phase 6 Levee Repairs at Sites 83, 84, 85, 86, 87, 88, and 89 (Lake or Streambed Alteration Agreement No. EPIMS-SOL-26955
California Department of Water Resources (DWR) 2017 SDDR Phase 6 Repair Site 97 Addendum to the IS/MND
California Department of Water Resources (DWR) 2017 SDDR Phase 6 Repair Sites 82 to 94
California Department of Water Resources (DWR) 2017 SDDR Phase 6 Repair Sites 82 to 94 Addendum to the IS/MND
California Department of Water Resources (DWR) 2017 Storm Damage DWR Rehabilitation - Phase 4 and 5 Repair Sites
California Department of Water Resources (DWR) 2017 Storm Damage DWR Rehabilitation Program - CDFW Region 3 Sites (Lake or Streambed Alteration Agreement No. 1600-2019-0171-R3)
California Department of Water Resources (DWR) 2017 Storm Water Damage DWR Rehabilitation - Phases 4 and 5 Project
California Department of Water Resources (DWR) SDDR Phase 4 & 5 (Lake or Streambed Alteration Agreement No. 1600-2019-0111-R2)
California Department of Water Resources (DWR) 2017 Storm Damage DWR Rehabiliation - Phase 4 and 5 Repair Sites
California Department of Water Resources (DWR) 2017 Storm Damage DWR Rehabilitation - Phase 4 and 5 Repair Sites