SCH Number 2014082049


Project Info

Title
Lake Camanche Water System Compliance Project IS-MND
Description
SWRCB is a responsible agency for this project. The SWRCB's Safe Drinking Water State Revolving Fund Program is providing funds for the project. The Amador Water Agency proposes to install a new 12-inch diameter water distribution line of approx. length of 3800 feet. The pipeline will be placed below ground in public easements or road right-of-way; a new 0.5 MG water storage tank will be built to replace existing Tank #9, and an existing 8-inch diameter pipeline between Tank 9 and wells 14 and 9 will remain in place and serve as a dedicated line to fill new storage tank to achieve chlorine contact time.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Amador Water Agency (AWA) Lake Camache Water System Compliance Project
Amador Water Agency (AWA) Lake Camache Water System Compliance Project
Amador Water Agency (AWA) Lake Camanche Water System Compliance Project IS-MND
Amador Water Agency (AWA) Lake Camanche Water System Compliance Project IS-MND