Lake Camache Water System Compliance Project

4 Documents in Project

Summary

SCH Number
2014082049
Lead Agency
Amador County Water Agency
Document Title
Lake Camache Water System Compliance Project
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2016
Present Land Use
Special Planning Area, Special Use District (X)

Document Description
SWRCB is a responsible agency for this project. The SWRCB's Safe Drinking Water State Revolving Fund Program is providing funds for the project. The Amador Water Agency proposes to install a new 12-inch diameter water distribution line of approx. length of 3800 feet. The pipeline will be placed below ground in public easements or road right-of-way; a new 0.5 MG water storage tank will be built to replace existing Tank #9, and an existing 8-inch diameter pipeline between Tank 9 and wells 14 and 9 will remain in place and serve as a dedicated line to fill new storage tank to achieve chlorine contact time.

Contact Information
Gene Mancebo
Amador County Water Agency
12800 Ridge Road
Sutter Creek, CA 95685

Phone : (209) 223-3018

Location

Coordinates
38°15'29.9"N 120°59'47.3"W
Counties
Amador
Cross Streets
Goose Creek Road and Village Drive
Zip
95640
Total Acres
2
State Highways
SR 88
Waterways
Camanche Reservoir
Other Location Info
Camanche Village

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
1001 I Street, 17th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print