SCH Number 2008082041
Project Info
- Title
- El Dorado Canal 2011-2012 Flume Replacement Program
- Description
- The 1.6 acre El Dorado Canal Flume Replacement Program Project consists of improving 3,000-linear feet of Rock Crusher Road. The purpose of this project is to improve safe equipment access to the El Dorado Canal System.
6 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | El Dorado Irrigation District | El Dorado Flume Replacement Program: Flumes 2, 2A, 3, 9, 41, 46A, 47 and 51 | |
NOP | El Dorado Irrigation District | El Dorado Canal Flume Replacement Program | |
NOD | El Dorado Irrigation District | El Dorado Canal Flume Replacement Program | |
NOD | El Dorado Irrigation District | El Dorado Canal Flume Replacement Program | |
EIR | El Dorado Irrigation District | El Dorado Flume Replacement Program: Flumes 2, 2A, 3, 9, 41, 46A, 47 and 51 | |
NOP | El Dorado Irrigation District | El Dorado Flume Replacement Program: Flumes 2, 2A, 3, 9, 41, 46A, 47 and 51 |