SCH Number 2008012059
Project Info
- Title
- East-West Water Transmission Pipeline Project- Phase II
- Description
- The project is part of the City of Fairfield East-West Water Transmission Pipeline Project, a 36" water transmission line connecting existing water mains. The purpose of the new transmission main is to pump water from the North Bay Regional Water Plan to Cordelia providing a redundant system for the existing waterline. Construction of the pipeline under-crossing below Ledgewood Creek will require the excavation of jacking and receiving pits on either side of the channel. The eastern jacking pit will be ~12' wide by 40' long and ~10' from below the flow line of Ledgewood Creek to the pipeline invert.
3 documents in project