East-West Water Transmission Pipeline Project- Phase II
3 Documents in Project
Summary
SCH Number
2008012059
Lead Agency
City of Fairfield
Document Title
East-West Water Transmission Pipeline Project- Phase II
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2008
Present Land Use
Public rights of way. Major Arterial, Minor Arterial, Collector, and Residential Medium Density, Light Industrial and Business Park and Public Facility in Fairfield. In Solano County, Agriculture.
Document Description
The proposed project involves installation of a 30-inch potable water line between Hale Ranch Road and the West America Drive/Adagio Drive intersection. This 2.5 mile route is the second segment of the East-West Water Transmission Pipeline; the City previously approved construction for the 7.5-mile route connecting existing water mains at the Hale Ranch Road/Cordelia Road and Cement Hill Road/Clay Bank Road intersections. The purpose of the new transmission main is to pump water from the North Bay Regional Water Plant (NBR) to Cordelia.
The second segment consists of an approximately 2.5-mile route between Hale Ranch Road and West America Drive. The pipeline would utilize City right-of-way, where available, and would be placed within the roadway right-of-way of two new roads proposed as part of the Fairfield Corporate Commons and North Connector projects. The pipeline would also traverse a section of agricultural land.
Contact Information
Name
Joseph A. Lucchio
Agency Name
City of Fairfield, Department of Community Development
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fairfield
Counties
Solano
Cross Streets
Hale Ranch Road/Cordelia Road and West America Drive and Adagio Drive
Zip
94533, 34
State Highways
SR-12, I-80
Railways
UPRR, Redwood Northern RR
Schools
Solano Community College
Waterways
Ledgewood Creek, Suisun Valley Creek and Dan Wilson Creek
Notice of Determination
Approving Agency
City of Fairfield
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.