East-West Water Transmission Pipeline Project- Phase II
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008012059
- Lead Agency
- City of Fairfield
- Document Title
- East-West Water Transmission Pipeline Project- Phase II
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/26/2008
- Present Land Use
- Public rights of way. Major Arterial, Minor Arterial, Collector, and Residential Medium Density, Light Industrial and Business Park and Public Facility in Fairfield. In Solano County, Agriculture.
- Document Description
- The proposed project involves installation of a 30-inch potable water line between Hale Ranch Road and the West America Drive/Adagio Drive intersection. This 2.5 mile route is the second segment of the East-West Water Transmission Pipeline; the City previously approved construction for the 7.5-mile route connecting existing water mains at the Hale Ranch Road/Cordelia Road and Cement Hill Road/Clay Bank Road intersections. The purpose of the new transmission main is to pump water from the North Bay Regional Water Plant (NBR) to Cordelia. The second segment consists of an approximately 2.5-mile route between Hale Ranch Road and West America Drive. The pipeline would utilize City right-of-way, where available, and would be placed within the roadway right-of-way of two new roads proposed as part of the Fairfield Corporate Commons and North Connector projects. The pipeline would also traverse a section of agricultural land.
- Contact Information
-
Joseph A. Lucchio
City of Fairfield, Department of Community Development
Lead/Public Agency
1000 Webster Street, Room 200
Fairfield, CA 94533
Phone : (707) 428-7647
Location
- Cities
- Fairfield
- Counties
- Solano
- Cross Streets
- Hale Ranch Road/Cordelia Road and West America Drive and Adagio Drive
- Zip
- 94533, 34
- State Highways
- SR-12, I-80
- Railways
- UPRR, Redwood Northern RR
- Schools
- Solano Community College
- Waterways
- Ledgewood Creek, Suisun Valley Creek and Dan Wilson Creek
Notice of Determination
- Approving Agency
- City of Fairfield
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Fairfield, City Hall, 1000 Webster St., Room 200, Fairfield, CA 94533
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.