Environmental Protection Corporation - Approval of Remedial Action Plan
Description
The CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the Environmental Protection Corporation (EPC), Eastside Landfill Facility - Remedial Action Plan (Project). The entire Project will consist of moving soil from five (5) identified borrow areas and capping the adjacent EPC Eastside Landfill closure sites. The entire Project is located on an approximately 240-acre parcel. The Project would consist of capping approximately 84 acre of former landfill area from borrow sites that total approximately 100 acres. The EPC Eastside Landfill was operated from 1971 to 1985 by EPC. The EPC Eastside Landfill Project will result in the construction of two (2) temporary road crossings across an unnamed drainage, to be used for heavy equipment access between the landfill and borrow area. Construction will include the installation of two (2) culverts, and construction of a road crossing resulting in approximately 0.04 acres of impact to the drainage.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Department of Toxic Substances Control Environmental Protection Corporation, Eastside Landfill Site, Explanation of Significant Differences
Department of Toxic Substances Control Environmental Protection Corporation, Eastside Landfill Facility - Remedial Action Plan
Department of Toxic Substances Control Environmental Protection Corporation, Eastside Landfill Facility - Remedial Action Plan
Department of Toxic Substances Control Environmental Protection Corporation - Approval of Remedial Action Plan