Environmental Protection Corporation, Eastside Landfill Site, Explanation of Significant Differences

4 Documents in Project

Summary

SCH Number
2007051148
Lead Agency
Toxic Substance Control, Department of (Department of Toxic Substances Control)
Document Title
Environmental Protection Corporation, Eastside Landfill Site, Explanation of Significant Differences
Document Type
NOD - Notice of Determination
Received
Posted
4/26/2019

Document Description
The project consists of modification of the materials used to cap the impoundments at the Environmental Protection Corporation, Eastslde Landfill Site (Site), as documented in the Explanation of Significant Differences (ESD). The ESD proposes closing the impoundments by installing a structured geomembrane (Closure Turf) cap instead of a monoflll soil cap. The proposed changes to the remedial actions are consistent with a Remedial Action Plan (RAP) approved by DTSC in 2008. The 2008 RAP proposed to remediate the Site by installing a monofill cap over the surface impoundments recording a deed restriction and conducting long-term monitoring. Long-term monitoring Includes monitoring of the cap, groundwater, surface water, and air emissions, along with maintaining site security, The fundamental cleanup activities proposed In the ESD remain consistent with remedial actions approved In the RAP. *see nod for more details.

Contact Information
Thomas Tse
DTSC
8800 Cal Center Drive
Sacramento, CA 95826

Phone : (916) 255-3643

Location

Counties
Kern
Other Location Info
Round Mountain Road, about 15 miles northeast of Bakersfield

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
8800 Cal Center Drive Sacramento, CA 95826

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2007051148   PDF 160 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print