Environmental Protection Corporation, Eastside Landfill Facility - Remedial Action Plan

4 Documents in Project

Summary

SCH Number
2007051148
Lead Agency
Department of Toxic Substances Control
Document Title
Environmental Protection Corporation, Eastside Landfill Facility - Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2008
Present Land Use
Industrial
Document Description
The Department of Toxic Substances Control (DTSC) has approved a Remedial Action Plan (RAP) for cleanup of the former Environmental Protection Corporation, Eastside Disposal Facility located in Bakersfield. The RAP has been prepared in accordance with the California Health and Safety Code, Sections 25356.1 (h) and 25187 and the evaluation of remedial actions is consistent with the National Contingency Plan. Chevron is conducting the site cleanup under the requirements of California Health and Safety Code, sections 25355.5 (a)(1)(B) and (c), 25358.3(a), 58009 and 58010. The RAP proposes to remediate the Site by installing a monofill cap over the surface impoundments, recording a deed restriction and conducting long-term monitoring. Long-term monitoring includes monitoring of the cap, groundwater, surface water and air emissions and maintaining site security. The project RAP and Health Risk Assessment are incorporated by reference.

Contact Information

Name
Thomas Tse
Agency Name
California Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Round Mountain Road, about 15 miles northeast of Bakersfield
Zip
93301
Total Acres
250
Parcel #
093-290-01-00-6
Waterways
Kern River
Township
28S
Range
29E
Section
30

Notice of Determination

Approving Agency
California Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print