Environmental Protection Corporation, Eastside Landfill Facility - Remedial Action Plan

4 Documents in Project

Summary

SCH Number
2007051148
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Environmental Protection Corporation, Eastside Landfill Facility - Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
4/1/2011
Present Land Use
Industrial
Document Description
The CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the Environmental Protection Corporation (EPC), Eastside Landfill Facility - Remedial Action Plan (Project). The entire Project will consist of moving soil from five (5) identified borrow areas and capping the adjacent EPC Eastside Landfill closure sites. The entire Project is located on an approximately 240-acre parcel. The Project would consist of capping approximately 84 acre of former landfill area from borrow sites that total approximately 100 acres. The EPC Eastside Landfill was operated from 1971 to 1985 by EPC. The EPC Eastside Landfill Project will result in the construction of two (2) temporary road crossings across an unnamed drainage, to be used for heavy equipment access between the landfill and borrow area. Construction will include the installation of two (2) culverts, and construction of a road crossing resulting in approximately 0.04 acres of impact to the drainage.

Contact Information

Name
Annette Tenneboe
Agency Name
DFG Central Region
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Round Mountain Road, about 15 miles northeast of Bakersfield
Zip
93301
Total Acres
250
Parcel #
093-290-01-00-6
Waterways
Kern River
Township
28S
Range
29E
Section
30

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes