SCH Number 2007021136
Project Info
- Title
- San Benito County Water District Recycled Water Facility Phase I Demonstration Project
- Description
- The project involves modifying the existing Pond #2 of the seasonal storage reservoir at the City of Hollister Domestic Waste Reclamation Facility (DWRF), the construction of which was analyzed in the 2006 EIR. This storage area would consist of a 9.02 AF, lined interior pond system with associated pipelines constructed within the existing, disturbed Pond #2 (Project Modifications). New pipelines and diversion structures would enable the control of water into and out of the proposed 9.02-AF pond, and would include approximately 320 ft of 20-in pump return pipeline and a gate, as well as an approximately 120-ft long, 18-in overflow pipeline. In addition, survey crest monuments, and a reservoir level gauge would be installed to monitor any settlement of the new embankments and water pressures/levels. Further, perimeter chain link fence, and bird distraction system consisting of netting or wire with reflective tape will be installed.
11 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | San Benito County Water District | Addendum to the San Benito County Water District Reclaimed Water Storage Pond Project Subsequent EIR | |
NOD | San Benito County Water District | Recycled Water Facilities Phase 1 Service Area Project (Project); | |
ADM | San Benito County Water District | San Benito County Water District Recycled Water Facility Phase I Demonstration Project | |
NOD | San Benito County Water District | City of Hollister Sprayfield Project and San Benito County Regional Recycled Water Facility Project | |
NOD | San Benito County Water District | Reclaimed Water Irrigation Project Subsequent EIR for the San Benito County Water District Recycled Water Facility Phase I Demonstration Project | |
SIR | San Benito County Water District | San Benito County Water District Recycled Water Facility Phase I Demonstration Project | |
NOP | San Benito County Water District | San Benito County Water District Recycled Water Facility Phase I Demonstration Project | |
FIN | San Benito County Water District | Reclaimed Water Irrigation Project Subsequent EIR for the San Benito County Water District Recycled Water Facility Phase I Demonstration Project | |
NOD | San Benito County Water District | City of Hollister Sprayfield Project and San Benito County Regional Recycled Water Facility Project | |
SIR | San Benito County Water District | Reclaimed Water Irrigation Project Subsequent EIR for the San Benito County Water District Recycled Water Facility Phase I Demonstration Project | |
NOP | San Benito County Water District | City of Hollister Sprayfield Project and San Benito County Regional Recycled Water Facility Project |