Addendum to the San Benito County Water District Reclaimed Water Storage Pond Project Subsequent EIR

11 Documents in Project

Summary

SCH Number
2007021136
Lead Agency
San Benito County Water District
Document Title
Addendum to the San Benito County Water District Reclaimed Water Storage Pond Project Subsequent EIR
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2016
Document Description
The project involves modifying the existing Pond #2 of the seasonal storage reservoir at the City of Hollister Domestic Waste Reclamation Facility (DWRF), the construction of which was analyzed in the 2006 EIR. This storage area would consist of a 9.02 AF, lined interior pond system with associated pipelines constructed within the existing, disturbed Pond #2 (Project Modifications). New pipelines and diversion structures would enable the control of water into and out of the proposed 9.02-AF pond, and would include approximately 320 ft of 20-in pump return pipeline and a gate, as well as an approximately 120-ft long, 18-in overflow pipeline. In addition, survey crest monuments, and a reservoir level gauge would be installed to monitor any settlement of the new embankments and water pressures/levels. Further, perimeter chain link fence, and bird distraction system consisting of netting or wire with reflective tape will be installed.

Contact Information

Name
Jeff Cattaneo
Agency Name
San Benito County Water District
Contact Types
Lead/Public Agency

Location

Cities
Hollister
Counties
San Benito
Cross Streets
State Route 156, State Route 25 and Wright Road
Zip
95023
Parcel #
various
State Highways
156
Railways
Southern Pacific
Airports
Hollister Municipal
Schools
Calaveras Elementary School
Waterways
San Benito River
Township
12,13S
Range
4, 5E
Section
Unsect
Base
MDB&M

Notice of Determination

Approving Agency
San Benito County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes