SCH Number 2005122101


Project Info

Title
Recirculation of Tidewater Crossing Master Development Plan Project
Description
The project includes excavating approximately 10 cubic yards of soil from the dry bed of the stream channel, and excavated 10 cubic yards of rock slope protection into the stream channel. An additional 68 cubic yards of soil will be excavated from the banks of the stream channel above the ordinary high-water mark, and 68 cubic yards of rock slope protection will be placed along the banks of the stream channel above the OHWM. Above the rock slope protection and OHWM, a 24-inch diameter outfall will be installed in the upper bank of the stream channel for conveying storm water flows from the detention basin pump station of the adjacent property
Download CSV New Search

 

9 documents in project

Type Lead/Public Agency Received Title
City of Stockton French Camp Slough Storm Drain Outfall (Lake and Streambed Alteration Agreement EPIMS Notification No. SJN-34173-R2)
City of Stockton Tidewater Crossing Master Development Plan Project
City of Stockton French Camp Slough Outfall Installation Project
City of Stockton French Camp Slough Sewer Pipeline
City of Stockton Permit No. 19380: Tidewater Crossing Outfall Project
City of Stockton Tidewater Crossing Outfall project
City of Stockton Recirculation of Tidewater Crossing Master Development Plan Project
City of Stockton Tidewater Crossing Master Development Plan Project
City of Stockton Tidewater Crossing Master Development Plan Project