Permit No. 19380: Tidewater Crossing Outfall Project

5 Documents in Project

Summary

SCH Number
2005122101
Lead Agency
Stockton, City of (City of Stockton)
Document Title
Permit No. 19380: Tidewater Crossing Outfall Project
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2020
Project Applicant
Armoto Partners LLC

Document Description
Approval of Permit No.19380, under California Code of Regulations, Title 23, Article 3, Section 6 for work within an adopted plan of flood control to construct a storm-water outfall structure in the Littlejohns Creek-South Branch. The project also includes excavation of approximately 78 cubic yards of soil from the bed and banks of the Littlejohns Creek-South Branch to install approximately 78 cubic yards of clean rock slope protection in the bed and banks of the creek.

Contact Information
Jennifer Stewart
Central Valley Flood Protection Board
3310 El Camino Avenue, Suite 170
Sacramento, CA 95821

Phone : (916) 574-1719
jennifer.stewart@cvflood.ca.gov

Location

Counties
San Joaquin
Other Location Info
The project is located southwest of Stockton Metropolitan Airport, 1.9 miles west of State Route 99, and 0.8 mile northeast of East French Camp Road, in San Joaquin County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Board's administrative record of proceedings related to the encroachment permit is available for public review at the Board's office. Please note, the NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes